The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th July 2000, 03:36 PM
Susan
Unregistered Guest

 
Posts: n/a
Default Bulk Supplier PPAP Documentation Requirements

We are a QS 9000 registered, bulk material, tier 2 supplier.

Page 1 of PPAP 3rd Edition states that for bulk material suppliers, PPAP is not required unless requested by our customers. During a recent audit our auditor, SGS International, said that even if a customer does not request a PPAP, we still need to document/retain in-house the 19 items in table I.2.2 on page 16. We did not interpret
the standard this way. We are not creating/retaining this information unless requested by a customer (as a standard business pratice, we have some of the info but our retention time is approx. 5 years only).

What is the correct interpretation? If SGS is incorrect, how do I "point" this out to them?
Reply With Quote

Sponsored Links
  #2  
Old 21st July 2000, 11:45 AM
Spaceman Spiff's Avatar
Spaceman Spiff Spaceman Spiff is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: FL
Age: 44
 
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
Spaceman Spiff has less than 100 Karma points so far.
I Say...

Susan, your interpretation is the correct one. Section 4.2.4.1 of he QS9K 3rd Ed states "The supplier shall fully comply with all requirements set forth in the Production Part Approval Process (PPAP) manual." Since PPAP manual states that it is not required (which is a form of waiver), then SGS is out of line to require you to perform a PPAP exercise.
Reply With Quote
Sponsored Links

  #3  
Old 21st July 2000, 05:31 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Right or wrong, there are registrars who require at least 1 full PPAP to be completed as evidence that you have a system which can produce a PPAP whether you have ever been required to do one or not. But - I do not have direct experience in PPAPing bulk materials so I don't know what's involved in your case.
Reply With Quote
  #4  
Old 21st July 2000, 05:47 PM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Been there ,done that.
You will not be able to convince your registrar/auditor that they are wrong.
The requirement is quite clear 4.2.4.1 "fully comply...". This is a QS9000 requirement not a customer requirement.
If you are really convinced that your interpretation is correct submit it to the IASG for clarification.
Reply With Quote
  #5  
Old 13th June 2008, 02:00 PM
mkgakbani mkgakbani is offline
Shy Poster (1 to 5 Posts)

Registration Date: Jun 2008
Location: USA, WI
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 6
Karma: 10
mkgakbani has less than 100 Karma points so far.
Default Re: PPAP Documentation Requirements

CAn some one give me a format or sample of PPAP waiver form fo supplier??
Reply With Quote
  #6  
Old 13th June 2008, 02:03 PM
Stijloor's Avatar
Stijloor Stijloor is online now
Cross Forum Moderator

Registration Date: May 2003
Location: Charlotte, North Carolina.
Age: 61
 
Posts: 6,623
Thanks Given to Others: 1,316
Thanked 2,232 Times in 1,595 Posts
Karma Power: 377
Karma: 10934
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Default Re: PPAP Documentation Requirements

Quote:
Originally Posted by mkgakbani View Post

CAn some one give me a format or sample of PPAP waiver form fo supplier??
Hello mkgakbani! Welcome to The Cove Forums.

Can you explain this situation a little bit more?

Why would you need this waiver?

More information will allow my Fellow Covers to review and respond.

Stijloor.
Reply With Quote
  #7  
Old 13th June 2008, 02:04 PM
SteelMaiden's Avatar
SteelMaiden SteelMaiden is offline
Super Moderator

Registration Date: Jan 2001
Location: NC, USA
 
Posts: 3,140
Thanks Given to Others: 318
Thanked 770 Times in 525 Posts
Karma Power: 255
Karma: 7897
SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.
SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.SteelMaiden is appreciated, and has over 1700 Karma points.
Default Re: PPAP Documentation Requirements

Quote:
Originally Posted by mkgakbani View Post

CAn some one give me a format or sample of PPAP waiver form fo supplier??
Just to be clear...you are the customer, and you are waiving the requirement for a PPAP? Sorry, I just want to make sure that everyone is on the same page.

Back in the day....before I made life simple and moved to a non-automotive plant, any order requiring a PPAP, was clearly denoted as such from the customer. You no ask, we no PPAP. Is this what you are asking?

ETA: it looks like I was simulposting with Stijloor...
__________________
"It's fun to have fun, but you have to know how", Dr. Seuss
Man may have invented fire, it took a woman to learn how to play with it.

Last edited by SteelMaiden; 13th June 2008 at 02:06 PM. Reason: eta
Reply With Quote
  #8  
Old 13th June 2008, 03:04 PM
Stijloor's Avatar
Stijloor Stijloor is online now
Cross Forum Moderator

Registration Date: May 2003
Location: Charlotte, North Carolina.
Age: 61
 
Posts: 6,623
Thanks Given to Others: 1,316
Thanked 2,232 Times in 1,595 Posts
Karma Power: 377
Karma: 10934
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Default Re: PPAP Documentation Requirements

Quote:
Originally Posted by SteelMaiden View Post

ETA: it looks like I was simulposting with Stijloor...
Telepathic posters....

You know what they say about "great minds".......

Stijloor.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks

Tags
bulk supplier, documentation, ppap, requirements


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Cost for PPAP - Customer pays for samples and PPAP documentation from supplier blue_cove APQP and PPAP 8 19th June 2009 03:34 AM
PPAP Requirements for Raw / Bulk Materials? kmaechtlinger APQP and PPAP 6 25th July 2007 04:57 AM
Bulk Material PPAP for PCB shop? What would be considered as bulk material? rbutanas APQP and PPAP 5 25th May 2007 02:13 PM
Bulk material vendor (supplier) change - PPAP resubmission? SAE J403 grade 1020 steel Matts Supplier Quality Assurance and other Supplier Issues 6 30th November 2005 07:48 AM
PPAP Appendix F.3 "Customer Plant Connection" - Bulk Materials - Steel Coil Supplier Tim M APQP and PPAP 4 27th March 2000 04:25 PM



The time now is 10:53 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts