The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st July 2000, 02:39 PM
Douglas E. Purdy
Unregistered Guest

 
Posts: n/a
Interim Approval

Have an automotive customer who is requiring a Level 3 PPAP for a tooling rebuild, while at the same time wanting to meet the current delivery requirements. Due to the number of Special Characteristics they want for Capability Studies we are not able to turn in a complete PPAP Submittal in the time needed to get production running.

My questions are:

1) How do you submit a PSW for an Interim Approval when not all of the items are completed?

2) Is there an alternative way to meet both production requirements and PPAP requirements in this situation?

Thanks for any recommendations you may give!

------------------
Reply With Quote

Sponsored Links
  #2  
Old 21st July 2000, 05:23 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Re question 2 - that's exactly what the interim allows you to do.
When you fill out the interim worksheet you note the exceptions to "full" PPAP and what you are doing to ensure the product you are shipping. In other words, if because you did not do a full capability study, you do not (may not) know if your process is capable of producing with a 1.67 Cpk - to "guarantee" you will meet the spec. So you may add inspections, or 100% sorting for the product you ship.

Have you seen the worksheet? Fairly self explanatory. Submit what you have for PPAP with the interim documenting the exception. The B3 are used to it!

Reply With Quote
Sponsored Links

  #3  
Old 21st July 2000, 05:55 PM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Maintain contact with your customer on this one.
Also refer to section II of the PPAP for interim approval requirements.
Reply With Quote
  #4  
Old 24th July 2000, 12:33 PM
Douglas E. Purdy
Unregistered Guest

 
Posts: n/a
I only see a GM Interim Recovery Worksheet (GM 1411) in Section 2 of the PPAP. Diamler-Chrysler talks about an Interim Approval Authorization (IAA) document and Ford has other requirements. I do not see a worksheet generic for all three - OR am I missing something?

[This message has been edited by Douglas E. Purdy (edited 24 July 2000).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Interim Stages of Medical Device Manufacturing Production RCW ISO 13485 - Medical Devices - Quality Management Systems 4 24th August 2007 06:34 PM
8D timing questions and Interim Action Response markd Manufacturing and Related Processes 6 6th December 2006 06:57 PM
Receiving a 'Major' (Hold Point) during an Interim Assessment Alf Gulford Registrars (Certification Bodies) and Registration 5 31st October 2000 04:11 PM
ISO DIS 9001:2000 - Interim Standard Karen ISO 9001 - Quality Management Systems Standard 20 26th March 2000 12:58 AM
Interim PPAPs - Is this normal for GM, triplication of paperwork? Alan Greatbatch APQP and PPAP 2 24th March 2000 12:25 PM



The time now is 04:44 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts