The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th March 1999, 05:36 AM
ROSEMUND J.
Unregistered Guest

 
Posts: n/a
Default QS9000 3rd edition, 4.17

There are few requirements under 4.17.1, where:

1. the internal audit should cover all shift
2. Audit schedule updated annually, and

3. When internal/external nonconformance or customer complaints occur, the planned audit
frequency should be increased.

Please see below situation:

1) I believe this is only applicable to manufacturing related elements, such as 4.9,
4.12...etc. In my factory, I have QA specialist/operators doing shiftly audit focusing on product and process conformances. I also have interbal quality system auditor (trained and certified by consultants) focusing on systemic issue. Is this meet the intent?

2. What does it mean "updated annualy? My consultant told me, there should be a planned audit schedule and the schedule can only be changed annually. I have to follow the schedule consistantly without fail except there is special event. This is not feasible as a lot of activities, customer visit/audit, corperate audit..etc happening. We have to change the schedule to maximize our resources. Could anyone give me some suggestion, comment?

3. I do not know how to meet this. I believe every company has internal/external
non-conformance, if everytime we need to increase the frequency, I will be in trouble. Please advice.


Thanks.
Reply With Quote

Sponsored Links
  #2  
Old 17th March 1999, 08:04 PM
Batman
Unregistered Guest

 
Posts: n/a
Default

Hi Rosemund

1. Internal audits should "verify whether quality activities and the related results comply with planned arrangements and to determine the effectiveness of the quality system." It is difficult to restrict this to only manufacturing activity.

You seem to have folks involved in auditing, that's good. But the personnel should be independent of the activity that is being audited. We use operators but in different departments than they work.

2. Typically an audit schedule is prepared up to a year in advance. After accumulating findings and any other nonconformances over that time you must review those instances and decide if and where and what to adjust in your next audit schedule. If you determine that there is not enough documented reason to increase the frequency, you should have a record of that meeting and the decisions made.
Satisfying the customer - a visit for instance - should take precedence over a scheduled audit, if it must. I think an isolated instance or two would not offend your registrar, or your management. I would hope that if this becomes an issue, that management allocates resources to overcome this (QS 4.1.2.2)

3. Unfortunately it is a requirement, somewhat as a follow-up to corrective actions from findings and internal and external nonconformances, to increase your audits. Consider the reasoning - you have what you think is a good system, but the customer found a problem. Your system needs improvement, and auditing is one method of verifying this.

Hope this helps.
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
FMEA 3rd edition vs 4th edition - What are the main changes? Gilberto FMEA and Control Plans 2 9th March 2009 08:27 PM
Effects of the changes from 2nd edition to the 3rd edition on the calculation of GR&R zjp1339 Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6 30th March 2006 01:55 AM
AIAG's PPAP 3rd edition vs. PPAP 2nd edition IGORTS APQP and PPAP 3 12th April 2002 02:52 AM
QS9000 3rd edition - Is there a site where I can view/print the Third edition Ian Hughes QS-9000 - American Automotive Manufacturers Standard 1 21st May 2000 08:33 AM
QS9000 3RD EDITION IMPLEMENTATION dave osborn QS-9000 - American Automotive Manufacturers Standard 2 15th July 1998 06:50 PM



The time now is 02:35 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts