The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 5th September 1998, 10:36 AM
Chantal P Tardif
Unregistered Guest

 
Posts: n/a
Please Help! PPAP Capability Study - Infrequent batches - Conductor paste

I have a supplier to who I am requesting a PPAP submission. The only thing is that he is telling me that he can't do a full capability study since it takes 100 samples to performe the capability study. His process is producing conductor paste. So he produces a big batch once per three or four months. So he is telling me that his capability study would take over a year to do. So my question is the following, could this study be done on a 100 samples of this batch to verify the resistivity and viscosity in that same big batch to see the overall capability and then a long term capability study over the variability of this process from batch to batch. I'll wait for anyone response since I would require both but I don't want to be out of line. Thanks for your help!!!
Reply With Quote

Sponsored Links
  #2  
Old 5th September 1998, 12:25 PM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

I dont see why he cannot take samples every half hour or so and measure the capability like this.
In plastic injection I produce a large number of parts in a lot and I take the capabilities according to these individual pieces.
The point as I see it is to show that the process is stable and thus to take samples at a reqular interval shows the stability of the process.
Reply With Quote
Sponsored Links

  #3  
Old 15th March 2001, 04:45 PM
Casana's Avatar
Casana Casana is offline
Blueberry Nut

Registration Date: Sep 2000
Location: Cranford, NJ
Age: 45
 
Posts: 82
Thanks Given to Others: 14
Thanked 2 Times in 2 Posts
Karma Power: 40
Karma: 53
Casana has less than 100 Karma points so far.
Question

I know this is an old thread but it is similar to my current question...
We manufacture semiconductor devices, several thousand devices are created at the same time on a wafer.
For us to collect samples from 100 wafers is not practical - the time to run them would be months, and the cost would be huge.
So... can I just collect a lot data points from 3-5 wafers and estimate a Ppk, in order to submit the PPAP? The customer for this particular product is not an automotive one and they are not requiring PPAP (but our QS registration does!)
Thanks for any input.
Reply With Quote
  #4  
Old 15th March 2001, 04:57 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Chantal,

I assume by your post to the APQP/PPAP forum that you are already a tier I supplier to automotive.

Do you have two systems for part submission, one for automotive and one for non-automotive?

If you do, it sounds like a problam waiting to happen. I believe that if there is only one system to follow, there will be alot less headaches and confusion.

IMHO ASD...
Reply With Quote
  #5  
Old 16th March 2001, 08:39 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
Casana - Are you certain your QS registration requires you to do PPAP submissions for non automotive customers? My understanding is the instructions of the customer over-ride all requirements. If your customer states in a quote request that PPAP is not required, I don't think you can be held to PPAP requirements. Like Al says, two seperate systems is looking for trouble so we do "PPAP" as part of APQP even if it is not required. Some of the others would be more informed on this but IMHO, I don't think the QS requirement needs to compel an expensive study. I would use my ongoing process data to illustrate capability.
Dave
Reply With Quote
  #6  
Old 16th March 2001, 09:13 AM
AJLenarz AJLenarz is offline
Involved in Discussions

Registration Date: Feb 2001
Location: Canton, Ohio
Age: 38
 
Posts: 47
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
AJLenarz has less than 100 Karma points so far.
Chantal,

Your description of the product (conductor past, one batch every 3-4 months) would be considered “Bulk Material”. The PPAP rev 3 addresses this in Section I.2.2.9.6. In a nut shell it states, if you can’t or don’t have capability, you must do 100% inspection. 100% inspection means an evaluation of samples(s) of product that is representative of the entire production run.

Make sure his control plan states that 100% inspection will be perform in lieu of capability.

Does this clear things up?
Reply With Quote
  #7  
Old 16th March 2001, 09:48 AM
Casana's Avatar
Casana Casana is offline
Blueberry Nut

Registration Date: Sep 2000
Location: Cranford, NJ
Age: 45
 
Posts: 82
Thanks Given to Others: 14
Thanked 2 Times in 2 Posts
Karma Power: 40
Karma: 53
Casana has less than 100 Karma points so far.
OK, I re-read the PPAP requirement. It DOES state in Note 2 that the Customer & Supplier need to agree on what index to use.
NOW - the next question is... what index is appropriate for processes that don't lend themselves to easily collecting 25-100 samples/lots in a timely/ cost effective manner? ie - Do manufacturers of equipment have to do Cpk's or what do they use???
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Capability Studies - Fewest Number of Parts for a Capability Study ivo Capability, Accuracy and Stability - Process, Machine, etc. 9 20th June 2006 04:25 PM
PPAP Preliminary Capability Studies - Batches - Paint Company Marc APQP and PPAP 3 31st January 2005 01:16 PM
Precontrol and Process Capability - CNC Lathes that run small batches - Short Runs Steven Sulkin SPC Monitoring and Statistical Analysis Techniques 12 9th December 2002 02:36 PM
Capability Study for Level 3 PPAP - They are asking for a 100 peice capability study 1236 Paul APQP and PPAP 4 11th August 2000 04:48 PM
Capability Study - Feasible? Capability Study when there is No Set Target Value precabcorp SPC Monitoring and Statistical Analysis Techniques 2 27th February 2000 11:08 PM



The time now is 12:27 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts