The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 26th March 2004, 12:22 PM
Ross_Henderson Ross_Henderson is offline
Inactive Registered Visitor

Registration Date: Mar 2004
Location: Berkshire, UK
Age: 32
 
Posts: 4
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 24
Karma: 10
Ross_Henderson has less than 100 Karma points so far.
Send a message via AIM to Ross_Henderson Send a message via Yahoo to Ross_Henderson
Question Inspection and Detection

I am getting ready to release some kit to production but need to come up with an inspection routine for this.

Inline monitoring is not a possibility so I need to tag QC onto the end of the process. The machine will output 3000 units an hour and due to the size of the staff the maximum inspection rate will be 1/250. The machine has a problem that causes it to occasionally produce ~10% defective units. The distribution of these defects are random throughout the finished units.

How do I use these figures to calculate the average amount of time to detect this issue or even if we are likely to detect it at all?

Obviously if I can show that employing an extra person to increase our inspection rate will save money overall then I can get this person.

Thanks in advance for you help.

Ross
Reply With Quote

Sponsored Links
  #2  
Old 26th March 2004, 12:47 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Ross_Henderson

I am getting ready to release some kit to production but need to come up with an inspection routine for this.

Inline monitoring is not a possibility so I need to tag QC onto the end of the process. The machine will output 3000 units an hour and due to the size of the staff the maximum inspection rate will be 1/250. The machine has a problem that causes it to occasionally produce ~10% defective units. The distribution of these defects are random throughout the finished units.

How do I use these figures to calculate the average amount of time to detect this issue or even if we are likely to detect it at all?

Obviously if I can show that employing an extra person to increase our inspection rate will save money overall then I can get this person.

Thanks in advance for you help.

Ross
Let me see if I understand, please correct me if I am in error:

You only have time to inspect 1 out of every 250 parts the machine produces, or 12 per hour? Why?

You can't adjust the machine to correct it if a defect is found?

The machine sometimes produces 10% defective at random?

Is this right???
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
Sponsored Links

  #3  
Old 26th March 2004, 01:07 PM
Ross_Henderson Ross_Henderson is offline
Inactive Registered Visitor

Registration Date: Mar 2004
Location: Berkshire, UK
Age: 32
 
Posts: 4
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 24
Karma: 10
Ross_Henderson has less than 100 Karma points so far.
Send a message via AIM to Ross_Henderson Send a message via Yahoo to Ross_Henderson
Default

The machine seems to occasionally damage a piece within the machine, when this damage occurs seems to be random and our equipment engineers are unable to find the exact cause and it seems to happen once or twice a month. When this damage occurs around 10% defects are produced, not every unit is affected and it is random the equipment manufacturers are aware of the issue but have more or less classed it as a feature.

If we increase the inspection frequency we will need to stop the machine in order for the operators to carryout the inspection if we slow the machine down we will create a bottleneck in the process.

Hope this answers your questions.

Ross
Reply With Quote
  #4  
Old 26th March 2004, 01:47 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Ross_Henderson

The machine seems to occasionally damage a piece within the machine, when this damage occurs seems to be random and our equipment engineers are unable to find the exact cause and it seems to happen once or twice a month. When this damage occurs around 10% defects are produced, not every unit is affected and it is random the equipment manufacturers are aware of the issue but have more or less classed it as a feature.

If we increase the inspection frequency we will need to stop the machine in order for the operators to carryout the inspection if we slow the machine down we will create a bottleneck in the process.

Hope this answers your questions.

Ross
I have a sneaking suspicion Mike S. and I are thinking along the same lines.

Here's how I see it, Ross. If you need a temporary fix, consider this:
  1. What damage does the machine make when it goes "awry" - same defect or random defects? (This has NOTHING to do with the random distribution throughout the run.)
  2. Is this damage instantly visible to the naked eye or is it internal, microsopic, or some other condition which cannot be discerned by vision?
  3. Is there a possibility you can screen for JUST the damage on all the parts (100%), leaving your inspection methodology alone? (i.e. Is the balance of the process in control?)
While you do the TEMPORARY fix of detecting defects, you MUST find the root cause of the problem and fix it. Omitting this root cause analysis and subsequent fix by throwing up your hands and letting a machine manufacturer tell you
Quote:
When this damage occurs around 10% defects are produced, not every unit is affected and it is random the equipment manufacturers are aware of the issue but have more or less classed it as a feature.
is to be a complete traitor to the Quality profession. If the current process cannot be fixed, you need a different process.

Would you give a gun to a soldier and tell him:
"This is a fine gun, but it has a peculiarity which we class as a "feature": Once in a while it develops a quirk and will blow up and kill the person wielding it once out of every ten shots. The anomoly is random. Work with it."
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #5  
Old 26th March 2004, 03:22 PM
Mike S. Mike S. is offline
An Early 'Cover'

Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,773
Thanks Given to Others: 24
Thanked 51 Times in 39 Posts
Karma Power: 103
Karma: 1849
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Default

I think the answers to Wes' questions are very important.

I might add: You say "When this damage occurs around 10% defects are produced". Does that mean that when the process is "working" there are basically no defects and when it is "not working well" the defect rate is ~ 10% and not 1% or 3%, but always around 10%?

If so, once the machine starts damaging parts "once or twice a month" you should be able to detect this problem with a sampling plan, but sampling only 1 out of 250 will likely not detect it. I have forgotten much of my probability knowledge through lack of use, but I think you'd have to look at about 30 parts with no defects to have a >95% assurance that the machine is not on the blink. Looking at the OC curves of various sampling plans should help you pick a workable sampling plan if you can't 100% test for this defect.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Reply With Quote
  #6  
Old 29th March 2004, 09:55 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
Default

2400 defective parts per shift! I couldn't imagine that your management would even consider running a process with a defect rate of 10%.
Surely you jest.
__________________
Sam Goody
Reply With Quote
  #7  
Old 29th March 2004, 05:03 PM
dfirka dfirka is offline
Involved - Posts

Registration Date: Nov 2003
Location: Argentina
 
Posts: 36
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
Karma: 47
dfirka has less than 100 Karma points so far.
Default

Ross,

I agree with the comments made so far, and I think that the problem you described needs more background to be solved without "shots in the dark":

Some additional questions:

1- What is the impact of the effect on the customer or clients ?
2- What is the cost of reparing a defective unit?
3- What is the total cost of allowing a defective unit to reach the customer?

One possibility in the short term is to find an inspection procedure fulfilling two goals:

1- decrease the total cost of poor quality

2 (and very important)- collect data to help in the prevention of the problem, trying to solve the special cause, or trying to find a model to predict the frequency of occurrences of the problem.

Based on your description so far, this could be a very juicy project for any BB.

Pls take this as a very limited answer due to lack of profund knowledge of the problem. Hope this helps.

Daniel
Reply With Quote
  #8  
Old 29th March 2004, 07:17 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Ross_Henderson

The machine has a problem that causes it to occasionally produce ~10% defective units. The distribution of these defects are random throughout the finished units.

Obviously if I can show that employing an extra person to increase our inspection rate will save money overall then I can get this person.

Thanks in advance for you help.

Ross
Say, Ross, if I agree to come help your organization "resolve" its issues, can we go punting on the Thames and carouse in a lot of pubs?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Who does most of your inspection - QC or Production JRKH Manufacturing and Related Processes 74 17th July 2008 05:21 PM
Detection rating for visual inspection in PFMEA vavrochj FMEA and Control Plans 19 6th June 2008 10:52 AM
PFMEA detection value for checking C of C in receiving inspection yjtoo FMEA and Control Plans 2 2nd May 2008 05:21 PM
Tracking Cost of Quality - Inspection laboratory and production inspection time/cost jkittle Quality Tools, Improvement and Analysis 7 16th May 2007 09:05 AM
Assignation of RPN rating (Detection) on Visual Inspection where subsequent operation GoKats78 FMEA and Control Plans 18 14th May 2006 12:28 AM



The time now is 05:23 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts