The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > The Reading Room > Registered Visitor Articles Archive


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 1st June 2004, 04:00 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is online now
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
Karma: 6867
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Read This! Life Cycle of a Trend - An SPC Overview

It is a new month, so I will pull out another article I have on hand. This one was originally written for the local ASQ newsletter. I ran it over about 4 newsletters. I also used it as a point paper at the Department of Energy. It is an overview of the use of control charts. I hope you find it interesting.

By the way, since I am pulling out old articles, and they were written "on the job" (with your taxpayer dollars), I should recuse myself from the $150 award. Hopefully, this article is a good seed for follow on articles.

Steve Prevette
Statistician for Fluor Hanford
Teacher at City University
Troublemaker at ASQ
Having fun on the Cove!
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc Life Cycle of a Trend rev1.doc (552.5 KB, 336 views)
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote

Sponsored Links
  #2  
Old 2nd June 2004, 09:04 AM
Swagg Swagg is offline
Swagg

Registration Date: Apr 2004
Location: USA, Knoxville, TN
Age: 48
 
Posts: 35
Thanks Given to Others: 10
Thanked 9 Times in 6 Posts
Karma Power: 24
Karma: 97
Swagg has less than 100 Karma points so far.
Default

Very nice paper, not bad for a "Bubble Head".
__________________
Swagg
"Work Smarter not Harder" :D
Reply With Quote
Sponsored Links

  #3  
Old 2nd June 2004, 12:39 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is online now
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
Karma: 6867
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Swagg

Very nice paper, not bad for a "Bubble Head".
I also glow in the dark when you turn out the lights.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
  #4  
Old 19th August 2004, 08:25 PM
Caster's Avatar
Caster Caster is offline
An Early Cover

Registration Date: Jul 2003
 
Posts: 897
Thanks Given to Others: 193
Thanked 175 Times in 130 Posts
Karma Power: 104
Karma: 3066
Caster is appreciated, and has over 1700 Karma points.
Caster is appreciated, and has over 1700 Karma points.
Default

Hi Steve

I’m enjoying your articles a lot. Here are some questions about “Life Cycle of a Trend”.

We are just about to generate a “pile O metrics” as required by TS16949.

People are having a field day with Excel to produce almost every imaginable type of graph. My personal favorite uses a 12 month moving average to hide a trend down. Some folks are very clever.

Every data point is either claimed by the owner as improvement if favorable or generates cries for immediate action by management if unfavorable.

People are absolutely dumbstruck when things suddenly get worse on the next data point after an improving “trend”.

Being a good little Quality Engineer I take the same data and whip up a control chart.

Sure enough most of the time the systems are in state of statistical control, most however operating at an unacceptable level.

A tremendous amount of passion and anger is spent explaining each point, and absolutely no effort is invested in improving the process to make an permanent change.

I am slowly trying to bring people over to using SPC charts, but it is a tough sell.

Now to the questions

I see you only show the average chart and not the range chart. Is this just to simplify for the paper?

I was always taught to look first at the range chart for increased variation, then inspect to average chart. I understood they made up a required set, both were needed.

These two charts cause much confusion to non Quality people.

Can your MW rule, trend rules and the average chart alone work the same as an average and range set?

If so, this “SPC Lite” approach is something I think I can sell to people.

What is lost by not using the range chart? Will the trend rules catch variation changes in any event?

Thanks for the articles, you are a clear thinker and an excellent explainer.

Cheers
Reply With Quote
  #5  
Old 19th August 2004, 10:31 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Quote:
Originally Posted by Steve Prevette

By the way, since I am pulling out old articles, and they were written "on the job" (with your taxpayer dollars), I should recuse myself from the $150 award. Hopefully, this article is a good seed for follow on articles.
If you have the most votes, your reward will then be given to the next person in line in the poll. I appreciate your contribution, but I also want folks to know that someone will get the check I send for the best article for the month.

For September submissions the amount will be US$200. If you're out of the US, as the last person was (Malta), it has to be a Western Union funds transfer. Technically I pay more - there is the transfer fee charged by Western Union - and the receiver gets a bit less - because the local agent charges for the currency conversion. Oh, well. So goes 'International Finance'!
Reply With Quote
  #6  
Old 31st August 2004, 11:41 AM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is online now
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
Karma: 6867
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Caster


Now to the questions

I see you only show the average chart and not the range chart. Is this just to simplify for the paper?

I was always taught to look first at the range chart for increased variation, then inspect to average chart. I understood they made up a required set, both were needed.

These two charts cause much confusion to non Quality people.

Can your MW rule, trend rules and the average chart alone work the same as an average and range set?

If so, this “SPC Lite” approach is something I think I can sell to people.

What is lost by not using the range chart? Will the trend rules catch variation changes in any event?

Thanks for the articles, you are a clear thinker and an excellent explainer.

Cheers
When I started making control charts at Hanford, I started with xbar-R charts, but never could get over the hurdle of management. The first charts were on cycle times on maintenance work, taken 5 work packages at a time in sequence completed. But management could only talk monthly charts, and were confused by why one month had 4 data points and the next month 6. Certainly the whole concept of range was way beyond them. I compromised upon straight x-charts, or data accumulated on a time interval rather than number of data points. Statistically it is weaker, but at least it got the data in front of management. If I had my "druthers" I would much prefer to work with xbar-R, but I don't think the losses in practice are that great. Empirically, the trend rules and the MW rule appear to work well, so I think the SPC-lite-ness of this approach is not too awful.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
  #7  
Old 31st August 2004, 03:29 PM
Caster's Avatar
Caster Caster is offline
An Early Cover

Registration Date: Jul 2003
 
Posts: 897
Thanks Given to Others: 193
Thanked 175 Times in 130 Posts
Karma Power: 104
Karma: 3066
Caster is appreciated, and has over 1700 Karma points.
Caster is appreciated, and has over 1700 Karma points.
Default

Steve



Yours is the second paper I have seen on what I call "SPC Lite".



Have you seen this one by Davis Balestracci?



http://deming.ces.clemson.edu/pub/den/data_sanity.pdf



I especially like Figure 4 on page 16. I see this all the time in meetings when people react/overreact to the next months data point without considering common cause variation.



How did you explain the presence of control limits to non Quality people? I can see blank stares in the boardroom if I try it.



I think there is also a powerful bias in play that makes use of SPC difficult with business data. Leaders are under pressure to punish every downturn and claim every improvement as due to their actions. They do not want to hear that in all reality, their actions had no effect.



Have you had any success stories using these charts to push people to radically change the process to get lasting improvement?



Caster
Reply With Quote
  #8  
Old 31st August 2004, 03:54 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is online now
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
Karma: 6867
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Caster

Steve



Have you seen this one by Davis Balestracci?



http://deming.ces.clemson.edu/pub/den/data_sanity.pdf



I especially like Figure 4 on page 16. I see this all the time in meetings when people react/overreact to the next months data point without considering common cause variation.



How did you explain the presence of control limits to non Quality people? I can see blank stares in the boardroom if I try it.



I think there is also a powerful bias in play that makes use of SPC difficult with business data. Leaders are under pressure to punish every downturn and claim every improvement as due to their actions. They do not want to hear that in all reality, their actions had no effect.



Have you had any success stories using these charts to push people to radically change the process to get lasting improvement?



Caster
Davis's paper is a GREAT paper. I have met Davis and we have stayed in touch now and then. Davis does base his SPC on Medians and Median Ranges, so this is a little different twist than I use. The median loses some statistical power, but is very robust against outliers (thus good for novices).

I like to use the smoke detector analogy when it comes to control charts. You also can discuss type I and II error that way. People understand they don't want their smoke detector alarming every two minutes. I have attached a little one page cheat sheet I use with management.

For success stories, please see the presentation I have submitted to ASQ for the next quality conference. Since this paper was made on government time (as a contractor), the US Government has posted it out on the OSTI fileserver, so it does not appear to be a violation of copyright if you go there. I just can't give it to you directly.

www.osti.gov/servlets/purl/827350-UhX4E5/native/
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: doc spcovrvw.doc (26.0 KB, 174 views)
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > The Reading Room > Registered Visitor Articles Archive

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
SPC (Statistical Process Control) Overview Steve Prevette SPC Monitoring and Statistical Analysis Techniques 60 16th July 2009 03:55 PM
Product Realisation and Life Cycle Processes eee ISO 9001 - Quality Management Systems Standard 6 21st August 2008 11:23 AM
Statistical Analysis SPC Trend explanation needed bkarthikeyan SPC Monitoring and Statistical Analysis Techniques 4 18th August 2008 09:24 AM
The Life Cycle of a Trend Craig H. The Reading Room 3 22nd April 2007 04:01 AM
What is the life cycle costing? Why so important? s_warin ISO 9001 - Quality Management Systems Standard 8 6th October 2002 01:22 AM



The time now is 09:45 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts