The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 2nd June 2004, 05:27 PM
Ingeniero1 Ingeniero1 is offline
Involved - Posts

Registration Date: Feb 2004
Location: Missouri
Age: 63
 
Posts: 131
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 32
Karma: 316
Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.
Default Is a not-very-well-kept record better than no record at all?

We have a situation at one of our product lines where the product output is occasionally tracked for number of rejects or defective parts. Unfortunately, this is not done all the time. There may be weeks when the daily output is closely monitored and the results recorded. Unfortunately, there also are weeks when the output, although still closely monitored, is recorded perhaps for only one or two days. Either way, no rejects ever make it past inspection, so bad product getting out is not an issue.

Other than to attempt to have the results recorded daily, which I honestly do not know at this time how successful I would be, I have two options:

A. Make no mention of these records.
B. State that these results are recorded on a random basis that is sufficient to provide evidence to indicate whether the process is in control.

Your opinions, please?

Thanks!
Alex
Reply With Quote

Sponsored Links
  #2  
Old 2nd June 2004, 05:37 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

By "... not-very-well-kept..." do you mean there are entries missing?
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
Sponsored Links

  #3  
Old 2nd June 2004, 05:45 PM
BadgerMan's Avatar
BadgerMan BadgerMan is offline
Moderator

Registration Date: Feb 2001
Location: Grand Rapids, Michigan
Age: 48
 
Posts: 483
Thanks Given to Others: 36
Thanked 73 Times in 64 Posts
Karma Power: 64
Karma: 979
BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.
Default

Quote:
Either way, no rejects ever make it past inspection, so bad product getting out is not an issue.
You seem to be implying that there is a subsequent sorting activity (100% inspection) to screen out the defective product?

Quote:
sufficient to provide evidence to indicate whether the process is in control.
I guess I would question if the process is truly in control if you are needing to screen out defectives from the lot.

Regardless whether you are recording the results of a monitoring activity (in-process inspection) or the results of a final inspection activity, I think you need to adequately record the results of the inspection activity (8.2.4?). Just my humble opinion based on my interpretation of your comments.
Reply With Quote
  #4  
Old 3rd June 2004, 12:28 AM
Govind's Avatar
Govind Govind is offline
Super Moderator

Registration Date: Apr 2004
Location: Fremont, California
 
Posts: 546
Thanks Given to Others: 13
Thanked 36 Times in 35 Posts
Karma Power: 50
Govind has disabled his/her Karma.
Default

Quote:
Originally Posted by Ingeniero1

We have a situation at one of our product lines where the product output is occasionally tracked for number of rejects or defective parts. Unfortunately, this is not done all the time. There may be weeks when the daily output is closely monitored and the results recorded. Unfortunately, there also are weeks when the output, although still closely monitored, is recorded perhaps for only one or two days. Either way, no rejects ever make it past inspection, so bad product getting out is not an issue.

Other than to attempt to have the results recorded daily, which I honestly do not know at this time how successful I would be, I have two options:

A. Make no mention of these records.
B. State that these results are recorded on a random basis that is sufficient to provide evidence to indicate whether the process is in control.

Your opinions, please?

Thanks!
Alex
Alex,
Your options A & B may help you to save from a finding during the ISO9001 auditing, but you got to get to the root of this situation.

If the monitoring activity is not done regularly, what is the impact it does to the next process steps?

You may be increasing the processing cost, cycle time by letting a defective product travel until final inspection, which could have been detected at the earlier stages of the process.

If this monitoring at this step is not required, you may as well remove it, since it is a non value added activity.

Another point,
Your option B:
"State that these results are recorded on a random basis that is sufficient to provide evidence to indicate whether the process is in control."

In my opinion this statement should be rephrased as:
State that these results are recorded in a periodic interval from samples selected on a random basis that is sufficient to provide evidence to indicate whether the process is in control.

Going by Control chart theory, merely selecting on a random basis will not indicate that process is in control.

Regards,
Govind.
Reply With Quote
  #5  
Old 3rd June 2004, 08:59 AM
DDaenen1 DDaenen1 is offline
Involved in Discussions

Registration Date: Apr 2004
Location: Belgium
Age: 40
 
Posts: 57
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 26
Karma: 142
DDaenen1 is appreciated, and has over 100 Karma points.DDaenen1 is appreciated, and has over 100 Karma points.
Send a message via MSN to DDaenen1
Default

I wouldn't go for A nor for B. If it is audit related, i would just let it be recorded as a non-conformity and use that as leverage towards the management to get the recording installed 100%. I've used this approach several times in the past, and yes, in some cases i got a hard time from the management how i could let this happen but i swallowed that easily if i got the problem fixed permanently as result of the whole situation.
__________________
No Pay, No Play!
Reply With Quote
  #6  
Old 3rd June 2004, 04:37 PM
Ingeniero1 Ingeniero1 is offline
Involved - Posts

Registration Date: Feb 2004
Location: Missouri
Age: 63
 
Posts: 131
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 32
Karma: 316
Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.Ingeniero1 is appreciated, and has over 300 Karma points.
Default

Perhpas some clarification is in order - my oversight:

The last step in the realization of our products (control instrumentation) is calibration.

Occasionally, a defective instrument makes it to the calibration step, and cannot be calibrated. When this happens, the unit is sent back to one of the previous operations for repair or replacement of the suspected faulty component. This procedure is followed religiously, and no instrument leaves the calibration shop without proper calibration – no if’s, and's, or but’s. After calibration, they go to a final inspection where everything else is checked.

By the way, a calibration record (card and a copy) always are generated when a unit is calibrated. These are properly kept and there is no issue with these.

The problem is that we do not always keep track of the number of units that have to be sent back for repair or parts replacement, which records also entail a brief description of the problem. As I said earlier, some weeks we may have a daily record of how many had to be sent back and the diagnosis, typically zero to two per day, but other weeks we may have no record of how well, or badly, things were.

These records tell us whether ‘too many’ units are being sent to calibration that shouldn’t, and why. We do not suspect that this is the case, as anytime that we do keep records, they show that the number is very small – as would be expected. Yet, there are voids or time lapses when no records are kept for perhaps two or three days. Could these be a problem?

Alex
Reply With Quote
  #7  
Old 3rd June 2004, 05:10 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Ingeniero1

Perhpas some clarification is in order - my oversight:

The last step in the realization of our products (control instrumentation) is calibration.

Occasionally, a defective instrument makes it to the calibration step, and cannot be calibrated. When this happens, the unit is sent back to one of the previous operations for repair or replacement of the suspected faulty component. This procedure is followed religiously, and no instrument leaves the calibration shop without proper calibration – no if’s, and's, or but’s. After calibration, they go to a final inspection where everything else is checked.

By the way, a calibration record (card and a copy) always are generated when a unit is calibrated. These are properly kept and there is no issue with these.

The problem is that we do not always keep track of the number of units that have to be sent back for repair or parts replacement, which records also entail a brief description of the problem. As I said earlier, some weeks we may have a daily record of how many had to be sent back and the diagnosis, typically zero to two per day, but other weeks we may have no record of how well, or badly, things were.

These records tell us whether ‘too many’ units are being sent to calibration that shouldn’t, and why. We do not suspect that this is the case, as anytime that we do keep records, they show that the number is very small – as would be expected. Yet, there are voids or time lapses when no records are kept for perhaps two or three days. Could these be a problem?

Alex
As I see it - the key term in your query is "problem," not "record-keeping."

In terms of a Business Management System, the "problem" is simply lack of information to determine a "root cause" or "common cause" of nonconformities which prevent the product from being calibrated prior to going out the door to a customer. Without such information, it is nearly impossible to implement corrective action or preventive action (in my opinion, "rework" means a failure in design, components, or process - it is NOT corrective action.)

If it were MY SHOP, I would concern myself with what is best for the operation, cure it and then, only then, concern myself with whether my record-keeping was a problem from a viewpoint of auditing a Standard.

There is no question on the table of
  • whether nonconforming product can reach the customer,
    only a question of
  • whether design, or components, or assembly processes, or some combination are the factor in nonconforming devices reaching the calibration station.
If anything, the "problem" is that you don't know and can't know without adequate records.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #8  
Old 3rd June 2004, 05:28 PM
BadgerMan's Avatar
BadgerMan BadgerMan is offline
Moderator

Registration Date: Feb 2001
Location: Grand Rapids, Michigan
Age: 48
 
Posts: 483
Thanks Given to Others: 36
Thanked 73 Times in 64 Posts
Karma Power: 64
Karma: 979
BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.BadgerMan is appreciated, and has over 900 Karma points.
Default

Good points Wes.

As others have said or alluded to, it is part of a process that you are missing.

If you don’t generate complete records regarding the nature of nonconformities and the subsequent repair actions (8.3), how can you adequately analyze such data (8.4), determine, the root cause(s), and take preventive or corrective actions (8.5)?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Records and Data - Quality, Legal and Other Evidence

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Form vs. Record - What is the Difference between a Form and a Record Sabbara Documentation Control Systems, Procedures, Forms and Templates 56 2nd July 2009 08:54 AM
Difference between Record and Quality Record DAWELAH ISO 9001 - Quality Management Systems Standard 12 16th August 2008 11:11 PM
Update DHF (Device History Record) when DMR (Device Master Record) changes? Watchwait Medical Devices (21 CFR part 820) 7 16th May 2008 11:57 AM
The Difference between a Document and a Record xiahmi Documentation Control Systems, Procedures, Forms and Templates 5 23rd March 2008 09:52 AM
Record Control - Who are the Record Custodian and Retention Times - ISO9001 - 7.5.3 juliov Records and Data - Quality, Legal and Other Evidence 9 15th September 2006 05:49 AM



The time now is 06:32 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts