The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 18th June 2004, 12:02 PM
RosieA's Avatar
RosieA RosieA is offline
Courtesy Access

 
Registration Date: Jun 2002
Location: Ithaca, NY
Age: 63
 
Posts: 644
Thanks Given to Others: 63
Thanked 86 Times in 50 Posts
Karma Power: 112
Karma: 1585
RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.
Let Me Help You Design Control Gating Process - Seeking work instructions and discussion

I've now been at my present company for a year...they've been ISO certified for over 10 years, so I figured that that every area had been pretty well reviewed to death in that time. However, yesterday I tried to do an audit of the Engineering area and found a system that is so tangled up that I couldn't audit several processes.

I've agreed to help the Director of Engineering rebuild. He's never heard of the Gating process that many companies use to manage design control. I've done Gating procedures in another company, but that was a very different kind of business than my current one. I wonder if anyone has information or work instructions they could share on Gating Processes that can help me get my thought processes kicked into gear?
__________________
Rosie A
Warrior Goddess of Quality

Sponsored Links
  #2  
Old 18th June 2004, 02:00 PM
ZeeMan's Avatar
ZeeMan ZeeMan is offline
Inactive Registered Visitor

 
Registration Date: May 2004
Location: Iowa
Age: 44
 
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 38
Karma: 10
ZeeMan has less than 100 Karma points so far.
We've been doing design-side process quality at my company for several years now, but I am unfamiliar with the term "gating".

Can you describe it for me so I can see if we're doing something similar?
Sponsored Links

  #3  
Old 18th June 2004, 02:56 PM
Govind's Avatar
Govind Govind is offline
Super Moderator

 
Registration Date: Apr 2004
Location: Fremont, California
 
Posts: 554
Thanks Given to Others: 14
Thanked 72 Times in 50 Posts
Karma Power: 94
Govind has disabled his/her Karma.
Gating is one of the approach to design and development Process

We use this process with gates:
Opportunity Assessment Gate,
Planning Gate (includes end of Life cycle planning),
Design Gate,
Qualification Gate,
Release to Manufacturing Gate.

These gates have Go/No Go decisions and several criteria need to be met before the Gate Review signoff by the project Team, Program manager.

Design and development process documentation are confidential to organizations. But you may find examples in

http://www.npd-solutions.com/pdforum.html

This is a very useful site you may want to explore.

Govind.
Thanks to Govind for your informative Post and/or Attachment!
  #4  
Old 18th June 2004, 02:58 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

 
Registration Date: Sep 2003
Location: Illinois
 
Posts: 10,422
Thanks Given to Others: 450
Thanked 2,608 Times in 1,703 Posts
Karma Power: 1121
Karma: 19500
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by ZeeMan

We've been doing design-side process quality at my company for several years now, but I am unfamiliar with the term "gating".

Can you describe it for me so I can see if we're doing something similar?
An analogy which might help envision the process:
Think of an intricate network of irrigation canals.
Each section of the network has a movable "gate" to allow or deny flow of water.
When the water comes from the main source, it is directed to the areas where it is needed and shunted from the areas where it isn't wanted by opening or closing the gates.
Within a business process (approving/denying projects), an original idea goes through these various gates, depending on the scope and application of the project. The art is in deciding WHICH projects go through WHAT approval processes and WHO (customer, regulator, bean counter, etc.) is involved in the decision.

I have a good idea of WHAT "gating" is. Not a strong response on performing the "art."
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
  #5  
Old 18th June 2004, 03:18 PM
RosieA's Avatar
RosieA RosieA is offline
Courtesy Access

 
Registration Date: Jun 2002
Location: Ithaca, NY
Age: 63
 
Posts: 644
Thanks Given to Others: 63
Thanked 86 Times in 50 Posts
Karma Power: 112
Karma: 1585
RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.RosieA is appreciated, and has over 1500 Karma points.
hi Zee,

A gating process is one in which you have pre-set review points (gates) that includes deliverables and require team approvals before moving forward.

Typically they would be something like:
Gate 1: Input requirements outlined
Gate 2: Product Specs defined, regulatory issues addressed, market analysis done,
Gate 3: Prototype completed, test plan developed, FMEA done
Gate 4: Verification and Validation complete, Manufacturing documentation done, manuals completed, regulatory requirements completed

At each step you update the design plan, and gain cross-functional approval on the progress of the design. These can act as the design review minutes with enough definition.

Hope that helps explain the structure.
__________________
Rosie A
Warrior Goddess of Quality
  #6  
Old 18th June 2004, 03:33 PM
The Taz!'s Avatar
The Taz! The Taz! is offline
Appreciated Member

 
Registration Date: Nov 2003
Location: Connecticut
Age: 63
 
Posts: 500
Thanks Given to Others: 3
Thanked 5 Times in 4 Posts
Karma Power: 90
Karma: 624
The Taz! is appreciated, and has over 500 Karma points.The Taz! is appreciated, and has over 500 Karma points.The Taz! is appreciated, and has over 500 Karma points.The Taz! is appreciated, and has over 500 Karma points.The Taz! is appreciated, and has over 500 Karma points.The Taz! is appreciated, and has over 500 Karma points.
Send a message via AIM to The Taz! Send a message via Yahoo to The Taz!
Gee. . . it sounds alot like the Milestone tracking on an AQP in Automotive. A TS Measureable of that process.
__________________
If something is over engineered. . . it will probably be under manufactured! (Jim Eustace 1993)
  #7  
Old 21st June 2004, 11:10 AM
ZeeMan's Avatar
ZeeMan ZeeMan is offline
Inactive Registered Visitor

 
Registration Date: May 2004
Location: Iowa
Age: 44
 
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 38
Karma: 10
ZeeMan has less than 100 Karma points so far.
Got it. We would refer to that as a "Decision Point" or "Management Authorization" process. Unfortunately, that kind of "gating" is only done for programmatics, not for the specifics of the Design & Development process.

If I understand your approach correctly, you want to implement an engineering process whereby engineering must have met certain criteria before they can proceed to the next design phase. If the point is strictly to create a clean process so that it is auditable, I think that will work fine. It will tell you if they've completed certain steps necessary to continue.

The approach our quality group has taken in design is that the design process has work product outputs that can be assessed for 'goodness'. For example, every design project has requirements, and these are documented. We (quality) review these outputs for fundamental characteristics that are critical to the documents goodness. For requirements, these are that the requirements are clear, traceable (to higher/lower level requirements), and verifiable.

Our engineering process also has a certain time-phasing to it so that there should be certain outputs at certain times, but quality is less concerned with that than with the quality of each output. Once we get to the end of design & development, there is a programmatic gate that quality has input on as to whether the design can be transitioned to the factory. This gate ensures that certain things are done. Quality can also say that the things that have been done are good.

We found that there are only a few 'categories' of design work products, and have established fundamental characteristics of goodness for each of these work product categories and are keeping these as metrics. The long-term approach is to develop a kind of profile that matches the amounts of these metrics over the design timeline with the result of that design in the factory and field. Doing this should allow us to determine the 'ideal' profile. We can then track current projects against the ideal and be able to predict whether a design project needs immediate help to prevent it from having problems in the factory and field. This comparison should also allow us to determine if there are some local practices (we have a lot of design groups) that are better/worse than the process norm and enable process improvement.

That's the dream. It's just getting started. I don't know if any of that helps you, Rosie, but I hope so.
  #8  
Old 7th September 2004, 02:54 PM
45fan 45fan is offline
E-Mails Invalid or Rejected by Recipient System

 
Registration Date: Aug 2002
Location: Pennsylvania
Age: 49
 
Posts: 21
Thanks Given to Others: 0
Thanked 3 Times in 1 Post
Karma Power: 0
Karma: 25
45fan has less than 100 Karma points so far.
Quote:
In Reply to Parent Post by Govind

Gating is one of the approach to design and development Process

We use this process with gates:
Opportunity Assessment Gate,
Planning Gate (includes end of Life cycle planning),
Design Gate,
Qualification Gate,
Release to Manufacturing Gate.

These gates have Go/No Go decisions and several criteria need to be met before the Gate Review signoff by the project Team, Program manager.

Design and development process documentation are confidential to organizations. But you may find examples in

http://www.npd-solutions.com/pdforum.html

This is a very useful site you may want to explore.

Govind.
Your gating process is very similar to the one I am writing up. Also a very standard sequence, with slightly different terms. My company is strictly involved in medical product development, no sales or manufacturing except for prototyping (that will hopefully change). So as far as ISO, and FDA regs, are concerned, our company is governed by design control, with all others supporting the design and development activities. My concerns are mainly on how to implement a "product development process" vs. design controls.

I've researched the forums but still have some questions that I am hoping will help me streamline my documentation:
1. Do you have a procedure that covers the design controls requirements explicitly and another for the development process, or just one that integrates both? I am interpreting 7.1 and 7.3.1 to occur at the same time for our organization, so it seems that one procedure can address all requirements. I also lump 7.2.1 and 7.2.2 with 7.3.2.

2. Does your gate 1, Opportunity assessment, include "research" activities such as concept development and feasibility studies or is that done at some other time? For the projects that we have, it seems next to impossible to correctly and efficiently conduct "research" like concept development and feasibility studies without implementing some design controls, at least to the point that design input requirements are specified. Since researchers don't like to be encumbered by extensive procedures and documentation requirements, which I agree does tend to stifle creativity, they tend to resist using design controls. To be fair, design controls are really intended to apply only to the design of the finished device, but when solutions are not readily apparent and research has hit several brick walls, it seems that it is time for some level of design controls, or at least more intelligent project management, which can be realized by the use of some level of design controls. This is why I asked the question as I did.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Design and Development - Process and Product

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Manufacturing Process Work Instructions vs. Work Procedures - Differences? sas1965 Documentation Control Systems, Procedures, Forms and Templates 10 24th January 2013 01:46 PM
Seeking examples of Work Instructions for progressive line Jan91168 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3 12th August 2008 12:50 AM
Work Instructions vs. Process Control Plans - No Substitutions? TS16949 - 7.5.1.2 oaktree Documentation Control Systems, Procedures, Forms and Templates 9 14th September 2006 01:23 PM
Work Instructions - Process Control and a SOR (Set-up, Operate, and Reaction) Plan AAguado ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 4 14th May 2002 08:58 PM
Process Control - The Requirement for listing references in Work Instructions Scott ISO 9001:1994 (Archived Discussions - For Reference Only) 4 9th December 2001 04:03 AM



The time now is 08:21 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, West Chester, Ohio 45069-1929
513 341-6272