The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th November 1998, 01:55 AM
Michael Garnsey
Unregistered Guest

 
Posts: n/a
I Say... Preventive and Predictive Maintenance - Information on procedures relating to 4.9.g.1

We are implementing a preventive and predictive maintenance plan for our automotive product lines. I was wondering if anyone had any advice, or could point me towards a good source of information on procedures relating to 4.9.g.1

Thanks!
Reply With Quote

Sponsored Links
  #2  
Old 11th November 1998, 04:47 PM
Roger Eastin Roger Eastin is offline
An Original Cover!

Registration Date: Dec 1998
Location: Greenville, SC
 
Posts: 471
Thanks Given to Others: 0
Thanked 4 Times in 4 Posts
Karma Power: 54
Karma: 45
Roger Eastin has less than 100 Karma points so far.
Default

I agree with Marc. You will also want to include something on predictive maintenance. Do you do fluid checks or IR checks of heat-sensitive components? Do you track/ optimize up-time?
Reply With Quote
Sponsored Links

  #3  
Old 11th November 1998, 05:05 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

You're right, Roger - I forgot the predictive part of the requirement.
Reply With Quote
  #4  
Old 12th November 1998, 01:04 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Main points:

You system can be centralized or distributed.

Set up a database (or other substitute such as a spreadsheet) and list your equipment and make a schedule (calendar) based upon it. Then follow the schedule.

You must have a list or procedure (criteria to act upon) for each piece of complex equipment. This can be the equipment manual or manufacturer's recommendation - but must be a document with criteria. Some folks categorize some equipment in a way where certain equipment gets a 'standard' PM.

You must have evidence that each PM is performed. If you miss or delay PMs, you must be ready to explain why and the effect upon your PM program and on the equipment.

Verifying/validating the PM system should be part of your internal audits.

You must show that you have critical parts available for critical manufacturing equipment and have a plan for breakdowns (ability to continue production). Be ready to explain your threshold for catastrophy vs normal (expected) failures: ie.: You cannot plan for everything but most you can plan for. Plan with respect to availability of parts from suppliers. Consideration of production schedule loading may be discussed.

There is software available.

[This message has been edited by Marc Smith (edited 11-11-98).]
Reply With Quote
  #5  
Old 26th November 1998, 01:58 AM
chen
Unregistered Guest

 
Posts: n/a
Default

Roger: Our compant is pursuing QS-9000 certification and would you pleasure to send me a procedure for PM?
TKS&B.RGDS!
Reply With Quote
  #6  
Old 30th November 1998, 05:05 PM
Michael Garnsey
Unregistered Guest

 
Posts: n/a
Default

Roger,

I would like one too, if possible!

Thanks,

Michael
Reply With Quote
  #7  
Old 3rd December 1998, 08:29 AM
barb butrym barb butrym is offline
Courtesy Access

Registration Date: Dec 1998
Location: South Central Massachusetts
 
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63
Karma: 151
barb butrym is appreciated, and has over 100 Karma points.barb butrym is appreciated, and has over 100 Karma points.
Default

why not add one to the pdf list...eh? I am sure marc would be happy to oblige if provided with one.

Mine are too company specific .... wouldn't help
Reply With Quote
  #8  
Old 3rd December 1998, 03:50 PM
Scott Knutson
Unregistered Guest

 
Posts: n/a
Default

Have any of you looked at TPM (Total Productive Maintenance)? This methodology is great for assuring that you have what you need with regard to Predictive and Preventive Maintenance. Marc has a string on TPM running, along with PDF files to download. Take a look. If you have other questions, let me know. I implemented a TPM system when I worked at Motorola.

------------------

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard > QS-9000 - American Automotive Manufacturers Standard

Bookmarks

Tags
predictive maintenance, preventive maintenance, procedure content, procedures


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to interpret TS Clause 7.5.1.4 Preventive and Predictive Maintenance? deminika ISO/TS 16949 - International Automotive Quality Systems Standard 8 24th October 2008 01:28 PM
Predictive maintenance vs Preventive maintenance Michiel ISO/TS 16949 - International Automotive Quality Systems Standard 3 13th February 2007 11:04 AM
Preventive Maintenance vs. Predictive Maintenance - Distinction between darkafar Definitions, Acronyms, Abbreviations and Interpretations 20 22nd November 2006 01:21 PM
Preventive and Predictive Maintenance - Benchmarking Partner frank-h Benchmarking - Methods and General Discussions 6 1st August 2002 09:06 AM
QS-9000 Clause 4.9.g.1 - Preventive Maintenance - Tool Wear Predictive Maintenance Frank45 QS-9000 - American Automotive Manufacturers Standard 1 23rd September 1999 12:00 PM



The time now is 06:50 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts