11th November 1998, 01:55 AM
|
|
|
Preventive and Predictive Maintenance - Information on procedures relating to 4.9.g.1
We are implementing a preventive and predictive maintenance plan for our automotive product lines. I was wondering if anyone had any advice, or could point me towards a good source of information on procedures relating to 4.9.g.1
Thanks!
|

11th November 1998, 04:47 PM
|
|
An Original Cover!
Registration Date: Dec 1998
Location: Greenville, SC
|
|
Posts: 471
Thanks Given to Others: 0
Thanked 4 Times in 4 Posts
Karma Power: 54 Karma: 45 
|
|
I agree with Marc. You will also want to include something on predictive maintenance. Do you do fluid checks or IR checks of heat-sensitive components? Do you track/ optimize up-time?
|

11th November 1998, 05:05 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
You're right, Roger - I forgot the predictive part of the requirement.
|

12th November 1998, 01:04 AM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
Main points:
You system can be centralized or distributed.
Set up a database (or other substitute such as a spreadsheet) and list your equipment and make a schedule (calendar) based upon it. Then follow the schedule.
You must have a list or procedure (criteria to act upon) for each piece of complex equipment. This can be the equipment manual or manufacturer's recommendation - but must be a document with criteria. Some folks categorize some equipment in a way where certain equipment gets a 'standard' PM.
You must have evidence that each PM is performed. If you miss or delay PMs, you must be ready to explain why and the effect upon your PM program and on the equipment.
Verifying/validating the PM system should be part of your internal audits.
You must show that you have critical parts available for critical manufacturing equipment and have a plan for breakdowns (ability to continue production). Be ready to explain your threshold for catastrophy vs normal (expected) failures: ie.: You cannot plan for everything but most you can plan for. Plan with respect to availability of parts from suppliers. Consideration of production schedule loading may be discussed.
There is software available.
[This message has been edited by Marc Smith (edited 11-11-98).]
|

26th November 1998, 01:58 AM
|
|
|
Roger: Our compant is pursuing QS-9000 certification and would you pleasure to send me a procedure for PM?
TKS&B.RGDS!
|

30th November 1998, 05:05 PM
|
|
|
Roger,
I would like one too, if possible!
Thanks,
Michael
|

3rd December 1998, 08:29 AM
|
|
Courtesy Access
Registration Date: Dec 1998
Location: South Central Massachusetts
|
|
Posts: 788
Thanks Given to Others: 0
Thanked 15 Times in 12 Posts
Karma Power: 63 Karma: 151  
|
|
why not add one to the pdf list...eh? I am sure marc would be happy to oblige if provided with one.
Mine are too company specific .... wouldn't help
|

3rd December 1998, 03:50 PM
|
|
|
Have any of you looked at TPM (Total Productive Maintenance)? This methodology is great for assuring that you have what you need with regard to Predictive and Preventive Maintenance. Marc has a string on TPM running, along with PDF files to download. Take a look. If you have other questions, let me know. I implemented a TPM system when I worked at Motorola.
------------------
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|