The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th October 1999, 11:58 AM
LEC
Unregistered Guest

 
Posts: n/a
Red Face Process FMEA - No evidence that actions are considered or taken - High RPNs

During our last audit a nonconformance was issued "there is no evidence that actions are considered or taken for high RPN in PFMEA".

The PFMEA manual says that RPN's can be between 1 and 1000 and that "for higher RPN's the team must undertake efforts to reduce this calculated risk through corrective action(s)".

Higher RPN's is a vague requirement, what is higher? We had already established in our procedure a threshold of 100. We would react anytime the RPN goes above 100.

My current thought is to challenge our registrar. I would like to have other opinions before undertaking.
Reply With Quote

Sponsored Links
  #2  
Old 11th October 1999, 03:24 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
You ask a very common question. What is the answer though? I'm not exactly sure, but I'll toss out an idea or two.

The process requires that the FMEA document be a living document. This means periodic reviews, re-evaluation of original RPNs, and updates and amendments as necessary. I have seen the Pareto technique used to identify the "vital few" over the "trivial many". But what if the vital failure modes only generate numbers below the arbitrarily selected 100 score? Should no action be taken because it is not warranted?

A closer look at how the RPN was derived might be necessary. Severity plays a very important role, 9 and 10 rating should require addressing. Also, a longer term study needs to be done to determine if your arbitrarily selected threshold has any merit. You may find that a higher/lower number is more appropriate. So what is appropriate?

Based on individual organizational circumstances, what is appropriate for one may not be for another. Your organization is made up of many "experts" for your product or service. These experts need to determine the appropriate number if you decide to use the scaling method. I would suggest using a statistical method but give consideration to those "gutt feel" issues (i.e. what resources do we have/can afford?). The most important factor I believe is that you record the events leading up to your designated threshold as this would indicate that your organization approached this issue as objectively as possible and that your 'experts' have given due consideration.

For the record, we also had the 100 point threshold in our SOPs. Arbitrarily selected, but a reasonable estimation in retrospect (studies of past results has shown that this number floats between 70-160). I should mention though that if you do select a threshold that you run the risk of creating bias in generating the RPN value (keep it under 100 or we'll have to do CA!). Additionally, as a group of experts you may decide that an item with an RPN of a lower number requires attention while one that is higher goes untreated. An inherent problem with scaling systems, they are linear and cloud vision. As I mentioned earlier, items with 9 or 10 severity generally require CA. An S*O*D for an RPN may be 9-2-2=36, another being 5-5-5=125. Which do you address first? Or at all?

Hopefully I haven't muddled up the works for you. My suggestion, give consideration to the non-scaling method. Deal with the vital few and learn from the process. I believe the results will be better.

Regards,

Kevin
Reply With Quote
Sponsored Links

  #3  
Old 13th October 1999, 07:57 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say...

Have you looked at the APQP and FMEA files in the pdf_files directory? http://Elsmar.com/pdf_files/

This gets wishy-washy because judgement comes into play as pointed out already. But in addition, let's say the severity was the same for 2 separate line items but one line item has an RPN of 400 and the other line item has an RPN of 50. The one with the 400 RPN number you have determined will cost US$5,000,000 to bring down while the RPN 50 you can reduce to 30 with about US$2500. That one with the RPN of 400 may just stay there for a while.

The 'old' automotive RPN rule was attack anything over 60, as I remember, but over the last several years FMEAs have really been picked apart by virtue of QS9000 requirements. There are a lot of judgement calls in what you work on, what you do not work on and why.

[This message has been edited by Marc Smith (edited 13 October 1999).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Statement of Fact - Considered Objective Evidence? Kathryn L. Mullins Definitions, Acronyms, Abbreviations and Interpretations 12 19th June 2008 02:46 AM
Corrective Actions Priority - Process FMEA (PFMEA) RPN Limits - Recommended Actions brutas FMEA and Control Plans 20 1st October 2006 08:12 AM
FMEA 3rd edition - FMEA is required only for high risk operations? Andrews FMEA and Control Plans 7 24th March 2006 02:20 PM
FMEA recommended actions column - What to do after actions are complete? Andrews FMEA and Control Plans 15 11th October 2005 02:15 AM
Defining the RPN cut off number - Working on the top 3- 5 high RPNs? rak FMEA and Control Plans 4 8th July 2002 09:07 AM



The time now is 09:29 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts