The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 23rd September 2004, 01:04 AM
sowmya sowmya is offline
Involved - Posts

Registration Date: Sep 2004
Location: INDIA
Age: 28
 
Posts: 78
Thanks Given to Others: 26
Thanked 2 Times in 2 Posts
Karma Power: 23
Karma: 50
sowmya has less than 100 Karma points so far.
Send a message via Skype™ to sowmya
Question How to Calculate the Cost of Poor Quality (COPQ)

Ours is a medium sized manufacturing unit.We are capturing all type of reworks (both internal and customer end) .Can anybody help me in calculating cost of poor quality. (From basics)
Reply With Quote

Sponsored Links
  #2  
Old 23rd September 2004, 03:35 AM
Sambasi Sambasi is offline
Involved - Posts

Registration Date: Aug 2002
Location: India
Age: 59
 
Posts: 84
Thanks Given to Others: 1
Thanked 1 Time in 1 Post
Karma Power: 35
Karma: 248
Sambasi is appreciated, and has over 200 Karma points.Sambasi is appreciated, and has over 200 Karma points.Sambasi is appreciated, and has over 200 Karma points.
Default Cost Of Poor Quality

My name is sambasi (K. Sambasivam I am working with Thai Baroda Industries Ltd., Thailand). To answer your question :-
1. What is Cost of Poor Quality?
Cost of Poor Quality (CPQ) is defined as sum spent on
- Preventive Costs.
- Apprisal Costs.
- Failure Costs (Internal and External Failure)
2. Cost of failures to be considered in manufacturing process.
- Internal : (1) Scrap, (2) Waste, (3) Repair/rework,
(4) Down grading.
- External : (1) Claim / Replacement, (2) Concession.
(3) Reshipment.
3. Calculations
- Cost of poor quality is calculated as a sum of all items.
4. Internal / External Failures and Defination.
1. Scrap : Total cost to produce a product which must be scrapped.
2. Waste : Cost of material that is left over and can not be used after
completion of an order.
3. Repair/rework : Cost to make a product usable.
4. Down Grading : Cost of material made from standard input but fails
to meet quality requirments at output stage. Or cost of salvaging
(cost of unusable output, while processing inputs with suspected
quality deviations)
5. Claim / Replacement : Adjustments made to compensate for returned
goods.
6. Concessions : Adjustment made to compensate for quality problem.
7. Reshipment : Repackign and reshipment costs for customer retruned
goods.
Reply With Quote
Sponsored Links

  #3  
Old 23rd September 2004, 07:22 AM
remsqa remsqa is offline
Involved - Posts

Registration Date: Dec 2003
Location: CHENNAI
Age: 29
 
Posts: 40
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 25
Karma: 10
remsqa has less than 100 Karma points so far.
Send a message via Yahoo to remsqa
Please Help! Cost Of Poor Quality

Hai sawmaya

Mr sambasivam havd explained all the basic and the relevant data in detail can i do summerize the same

In simple the COPQ is meant by the extra expence which is accoured due to the derotiation of Quality (REJ ,SCRAB)Or Expence made to correct the component to meet the expected charactertics (REWORK COST)

Or any extra cost made to deliver the component because of delay due to the Quality non conformance .It might me tracked as a premium freight.
Expecting all you value added comments

REGARDS
R.L.SATTHISH KUMAR
Reply With Quote
  #4  
Old 23rd September 2004, 09:00 AM
gpainter gpainter is offline
Courtesy Access

Registration Date: Sep 2001
Location: Southern Indiana
Age: 47
 
Posts: 941
Thanks Given to Others: 3
Thanked 29 Times in 25 Posts
Karma Power: 65
Karma: 696
gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.gpainter is appreciated, and has over 500 Karma points.
Default

For an average company it has been estimated that the cost of poor quality eats up 30% of your bottom line.
Reply With Quote
  #5  
Old 23rd September 2004, 09:05 AM
Lyn N Iles Lyn N Iles is offline
Registered Visitor

Registration Date: Aug 2002
Location: Northumberland, England
Age: 65
 
Posts: 13
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 59
Lyn N Iles has less than 100 Karma points so far.
Default Cost Of Poor Quality

Another cost of poor quality which may be significant is the possible loss of future orders from this customer.

Not only that, sometimes customers have contact with other organisations who may be existing customers or who might become customers in the future. If they are sufficiently annoyed by your failure to provide quality product or service, they may communicate this to these other organisations.

Good news travels fast - bad news travels even faster .........!

Lyn
Reply With Quote
  #6  
Old 23rd September 2004, 11:47 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,536
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Lyn N Iles

Another cost of poor quality which may be significant is the possible loss of future orders from this customer.

Not only that, sometimes customers have contact with other organisations who may be existing customers or who might become customers in the future. If they are sufficiently annoyed by your failure to provide quality product or service, they may communicate this to these other organisations.

Good news travels fast - bad news travels even faster .........!

Lyn
Ah, yes. It is a sad tale, but true:
"You never get a second chance to make a good first impression."
Most buyers don't have time or patience to work through a supplier's problems, they just move on to another supplier. I sure never go back to a filthy restaurant to see if they cleaned up.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #7  
Old 24th September 2004, 07:01 AM
Greg B's Avatar
Greg B Greg B is offline
Super Moderator

Registration Date: Mar 2003
Location: Rockhampton, Queensland, Australia
Age: 49
 
Posts: 832
Thanks Given to Others: 11
Thanked 31 Times in 22 Posts
Karma Power: 83
Karma: 1996
Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.Greg B is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by sowmya

Ours is a medium sized manufacturing unit.We are capturing all type of reworks (both internal and customer end) .Can anybody help me in calculating cost of poor quality. (From basics)
Sowmya,

Here is an attachment I placed on the cove, some time ago. You should try the search tool as there are many topics associated with the 'cost of quality'. Look at the bottom of this threads page and you will find some links that are automatically placed there by the forum software. Here is my attachment:

Non Conforming Flow 2.doc - Post Attachment

This is the original thread and explains the chart.
Costs of NonConformity - A Flow Chart Showing Costs Involved
Please take the time to review the thread and everyone's comments. I hope it helps.
__________________
- Greg B -
'Vision without action is a daydream. Action without vision is a nightmare'
Reply With Quote
  #8  
Old 24th September 2004, 05:34 PM
AllanJ AllanJ is offline
Inactive Registered Visitor

Registration Date: Jun 2004
Location: Michigan, USA
 
Posts: 312
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 36
Karma: 390
AllanJ is appreciated, and has over 300 Karma points.AllanJ is appreciated, and has over 300 Karma points.AllanJ is appreciated, and has over 300 Karma points.AllanJ is appreciated, and has over 300 Karma points.
Default

Quote:
Originally Posted by sowmya

Ours is a medium sized manufacturing unit.We are capturing all type of reworks (both internal and customer end) .Can anybody help me in calculating cost of poor quality. (From basics)
Whatever else people may advise you to do, including using the (almost discredited) conventional "quality cost" catgories of failure, prevention and appraisal, the people who can best help you, calculate the cost of poor quality, work in your accounting department.

If you want to get management attention, buy-in for what you are doing and their comprehension of the cost estimates you and your accounts department should together produce, use the official accounting system and the cost categories and terms with which your management is familiar. That will avoid the need to explain the jargon about failure, prevention etc, which not many managers use anyway, at the upper levels.

If you have the equipment and ability to download cost data into a spreadsheet, that will be of great assistance as you can then prepare your reports with graphical summaries.

Involve yourself with the accountants - as I have counseled many quality managers for 30 years or so, they can be your best allies

Last edited by AllanJ; 24th September 2004 at 05:36 PM. Reason: Minor typos and punctuation corrected
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis

Bookmarks

Tags
copq, cost of poor quality, cost of quality


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Personnel COPQ (Cost of Poor Quality) nado2020 Quality Management Related Issues 6 21st June 2009 11:26 AM
COPQ - Cost of Poor Quality - COPQ course for non-financial people Stevenli Misc. Quality Assurance and Business Systems Related Topics 1 4th April 2009 01:09 PM
Cost of Poor Quality (COPQ) and Reputation Manix Quality Tools, Improvement and Analysis 25 7th April 2008 01:31 AM
COPQ (Cost of Poor Quality) and COQ (Cost of Quality) - Differences peach Definitions, Acronyms, Abbreviations and Interpretations 26 5th January 2008 04:35 PM
COPQ - Cost of Poor Quality - Seeking recently published data on COPQ Johnny Misc. Quality Assurance and Business Systems Related Topics 4 11th February 2004 09:09 AM



The time now is 02:11 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts