The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Aerospace and Aviation Requirements > AS9100 Aerospace Standard and Requirements


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 27th September 2004, 12:23 PM
LukeT's Avatar
LukeT LukeT is offline
Inactive Registered Visitor

Registration Date: Aug 2004
Location: Wisconsin
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
LukeT has less than 100 Karma points so far.
Thumbs up AS9102 Part Revision Change Levels

I have a question that may seem confusing and that is because it is confusing. If anyone can decipher this and give me some input that would be great. Here is the situation.

Assembly A has a dash number of -004 and that is where the base documentation is at. Now we build this assembly at this level. As some point in time the assembly gets a revision change and instead of using the normal DRW rev. or BOM rev system of change the customer changes the assembly # to a different dash number say -005. Now the customer says that this change is the addition of the 52 jumper wires and 2 IC's, and it only is requiring a delta FAI to the -004 part. Keep in mind that while the -004, and the -005 both share the same PCB but the documentation for them is at their own level. Meaning if the -005 goes to a -985 it is the same assembly less coating or bond, etc, but the baseline documentation is at -005. Now if there was never a FAI performed at all at the -005 level and the board went to a -006 it is my opinion that it would need a FULL FAI at that level.

In my opinion this kind of change is a delta to the base line part number. If the change goes across two baseline part numbers then it should be a FULL FAI to create a baseline.

I know this sound crazy, but we are struggling here and I would like to see what if anything anyone can make out of this. Thanks
Reply With Quote

Sponsored Links
  #2  
Old 27th September 2004, 01:08 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by LukeT

I have a question that may seem confusing and that is because it is confusing. If anyone can decipher this and give me some input that would be great. Here is the situation.

Assembly A has a dash number of -004 and that is where the base documentation is at. Now we build this assembly at this level. As some point in time the assembly gets a revision change and instead of using the normal DRW rev. or BOM rev system of change the customer changes the assembly # to a different dash number say -005. Now the customer says that this change is the addition of the 52 jumper wires and 2 IC's, and it only is requiring a delta FAI to the -004 part. Keep in mind that while the -004, and the -005 both share the same PCB but the documentation for them is at their own level. Meaning if the -005 goes to a -985 it is the same assembly less coating or bond, etc, but the baseline documentation is at -005. Now if there was never a FAI performed at all at the -005 level and the board went to a -006 it is my opinion that it would need a FULL FAI at that level.

In my opinion this kind of change is a delta to the base line part number. If the change goes across two baseline part numbers then it should be a FULL FAI to create a baseline.

I know this sound crazy, but we are struggling here and I would like to see what if anything anyone can make out of this. Thanks
Ultimately, the question boils down to what the customer requires and whether any government agency regulations apply to the situation.

If the product is custom made for only one customer, the customer's requirements prevail unless a government regulation supersedes (for an FAA-PMA part, as an example.)

When we use the term FAI, are we discussing dimensional inspection or functional inspection to use as a baseline?

In my aerospace years, the consequences in documentation, approval, reporting, and implementation of the change were different, depending if the change was "major" or "minor." A major change meant nothing could be implemented (used) on an aircraft until a complete investigation of the ramifications of that change had been investigated by organization engineers, customer engineers, and FAA engineers and approved by all. Depending on contractual agreements, minor changes could be implemented after the organization alone had investigated and approved the change and up to six months was allowed to "notify" FAA of the minor change.

The question of the difference between major and minor is the stuff of a different thread, but it seems to me we are not getting a sufficient background on why you feel the baseline needs to be reset with a new FAI for what appears to be a "minor" change.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Sponsored Links

  #3  
Old 27th September 2004, 03:54 PM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default

IMO Configuration Control dictates that if the change affects form, fit or function then a new part number must be issued. The change in dash # from -004 to -005 is a change in Part Number indicating that interchangeability has been affected. This is not a revision to the original -004 part but a brand new part. More simply the -004 can never be used for a -005. Since it is, by definition, a new part.

It has been my experience that, when this occurrs, a full FAI (First Article Inspection) is required. By changing the part number the customer seemingly is indicating that they recognize the above mentioned requirement but feel that a delta is all that is necessary. Its there risk!

That having been said we yield to what the customer decries, although I have been known to bring the oversight to the customers attention for confirmation.
Reply With Quote
  #4  
Old 28th September 2004, 10:47 AM
LukeT's Avatar
LukeT LukeT is offline
Inactive Registered Visitor

Registration Date: Aug 2004
Location: Wisconsin
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
LukeT has less than 100 Karma points so far.
Default

Thanks for your input guys, let me say this. It is a customer driven thing, and this is for both dimmensional and a functional change. The way I looked at it was that if the -004 will never be used because it is made obsolete by the -005 then the -005 should have a FULL FAI performed on it. I just thought that there shold be a clear line all the way back to the baseline part number which is the -005, or -004. The spawn of those baselines would be -984 or -985. I am probably looking too hard at it though, and I have been told that if that is what the customer wants then that is what they get. My only concern would be that we can be compliant to the customer requirements and still be non-compliant to the standard.

You spoke of the fit, form or function requirement. This is one area where the customer has enhanced the requirement by making it necessary to do a FAI whenever there is an ECO that up revs either the BOM rev or the assembly rev, regardless if it is clerical or mechanical.

I did speak to one person in quality from the customer and they agreed that it would be a FULL FAI, but I was ultimately over ruled because the sales side would be affected by this so in order to keep our OTD and forecast a DELTA was performed and submitted.

This is a thankless job sometimes.

I have contacted SAE to get some clarification on the standard, I will contact their representative on Friday. Thanks again fellas!!
Reply With Quote
  #5  
Old 28th September 2004, 12:25 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

I have often spouted off about the term and concept of "Configuration Management" which addresses (among other things) the point at which changes cease to be revisions and become new "things."

In my own practice, I like to draw the line at backward and forward compatibility. This is where the "management" part of configuration management comes in. If the new revision won't fit or function in the previous version's place or vice-versa, then it's time to create a new document or part number.

My experience with "dash numbers" (essentially variations of a standard part created as a "family" of parts) is that EACH dash number is treated as a separate part for manufacturing, testing, inventory, and usage. One family of parts I recall were housings for sensors. Each dash number was identical to every other dash number in every dimension but two - overall length of the part and depth of the internal cavity. The difference between a series of dash numbers was in increments of one-tenth of an inch. The difference was critical in terms of the fit of the sensor which fit in the cavity. The parts were NOT interchangeable. We had performed FAI on each dash number as if it were a completely separate part.

We struggled to keep the parts from mixing in handling prior to hand-stamping a dash number on each part. Finally, we "FMEA'd" and "Poka Yoked" to the point where we convinced the customer to let us add non-functional "identity" grooves to each dash number part, so they could be visually identified without recourse to micrometers.

The net result was zero mixing of parts, elimination of a hand-stamping procedure, and a lower net cost to the customer (the grooving process was done simultaneously with cut-off), although we made a higher profit per piece.

The point being you need to communicate with the customer every time a question arises and then you can negotiate the best course of action for all concerned. In some cases, this may result in a saving which will endear you to a customer, but, in every case, will result in "peace of mind" from knowing possible glitches have been avoided. In no instance should you undertake the expense of FAI on your own unless there is a question in your mind that there may be a problem. If the customer is content with a normal inspection procedure (not an in-depth FAI), so should you be content - unless there is something you know about the production process which could introduce a discrepancy in one of the dimensions in common with all the other dash numbers (in my example, this might have been a possible change in internal diameter of the cavity from using a different boring tool)
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #6  
Old 9th September 2005, 11:53 AM
mshell's Avatar
mshell mshell is offline
Involved - Posts

Registration Date: Aug 2003
Location: United States/Georgia
Age: 39
 
Posts: 401
Thanks Given to Others: 0
Thanked 7 Times in 7 Posts
Karma Power: 50
Karma: 815
mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.mshell is appreciated, and has over 700 Karma points.
Default

I have no experince with AS9102 so please tell me what form is used to submit a Delta FAI?
__________________
Mshell
Reply With Quote
  #7  
Old 9th September 2005, 12:57 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by mshell

I have no experince with AS9102 so please tell me what form is used to submit a Delta FAI?
By "delta fai" do you mean a first article inspection made after a "change" has been made in a product?
Quote:


The key benefits from AS9102 will be that it clearly answers the larger questions revolving around the conduct of the FAI:
  • WHEN - AS9102 (Sections 5.1 & 5.2) clearly and definitively specifies when an FAI, or a delta FAI, must be conducted.
  • WHAT - AS9102 (Sections 5.1 & 5.6) describes what component of the end item must be included in the FAI and what inspections/verifications must be conducted on those components and their associated processes.
  • HOW - AS9102 (Sections 5.7 through 6.7) specifies how the FAI must be documented.
I'm not sure if I know of a specific "form" where one fills in the blanks - anyone else?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #8  
Old 9th September 2005, 01:09 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,292 Times in 1,546 Posts
Karma Power: 611
Karma: 20375
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Wes Bucey

By "delta fai" do you mean a first article inspection made after a "change" has been made in a product?

I'm not sure if I know of a specific "form" where one fills in the blanks - anyone else?
From the capitalization of "Delta" I thought that perhaps the airline was being referred to, but I guess we'll have to wait for clarification from the OP.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Requirements > AS9100 Aerospace Standard and Requirements

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Revision Levels on Documents - First Issue Revision Level silentrunning Documentation Control Systems, Procedures, Forms and Templates 9 4th August 2008 05:50 AM
ECO (Engineering Change Order) Revision - Letter change or part number change? kcmomde Manufacturing and Related Processes 13 28th July 2008 06:39 PM
AS9102 Revision A Released - 28 January 2004 Jnier Various Other Specifications, Standards, and related Requirements 7 8th July 2008 12:25 AM
TS 16949 Control Plan and Part Number Revision Change Level DerekCA FMEA and Control Plans 1 29th November 2007 08:02 PM
Revision levels Marchi ISO 9001:1994 2 11th July 2000 06:19 PM



The time now is 09:29 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts