|
Preventive
Medicine
Daily
Prevention
Health
Checkups
(Diagnosis)
Early
Treatment
Preventive
Maintenance
CATEGORY
STARTUP
FAILURE
CHANCE
FAILURE
WEAR-OUT
FAILURE
CAUSE
COUNTER
MEASURES
Decision/
Manufacturing
Errors
Operational
Errors
Wear-Out
Trial runs at
Acceptance &
Start-up Control
Proper
Operation
Preventative &
Maintainability
Improvement
Maintenance Prevention
Specified
Breakdown
Rate
Failure
Rate
Startup
Failure
Period
Chance
Failure
Period
Wear-Out
Failure
Period
Useful
Life
Reduction of
Failure Through
Maintenance
| Previous slide | Back to first slide | View graphic version |
All Y'All Come Back Now, Y' Hear?![]()
| FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user. |