Step 7: Minimize 1st Piece Qualification Time
- Empower Operator to Qualify @ Process
(Dedicated Gages, etc. @ Operation)
- Add Error Proofing Devices where Applicable
- Empower Operator to Approve “1st Piece
Quality”
- Apply Concept of “Quality at the Source”
- Quality Control does not have to Buy-in
- Foreman does not have to Buy-in
| Previous slide | Next slide | Back to first slide | View graphic version |
All Y'All Come Back Now, Y' Hear?![]()
FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user. |