The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  QS-9000
  ed 3 4.9 qs 9000

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   ed 3 4.9 qs 9000
terryd
Lurker (<10 Posts)

Posts: 2
From:elizabethtown, ky
Registered: Dec 98

posted 16 December 1998 11:06 PM     Click Here to See the Profile for terryd   Click Here to Email terryd     Edit/Delete Message   Reply w/Quote
In edition 3 of the QS 9000 under 4.9 it has added that contengency plans need to be established for loss of utilities, manpower shortages and machinery downtime. I've pretty much got the utilities and machinery but can anyone tell me the authorized accepted definition of "manpower shortage covers"?

we have a union in the plant but my HR would like to know the specific definition for the contengency plan

------------------

IP: Logged

barb butrym
Forum Contributor

Posts: 637
From:South Central Massachusetts
Registered:

posted 18 December 1998 08:26 AM     Click Here to See the Profile for barb butrym   Click Here to Email barb butrym     Edit/Delete Message   Reply w/Quote
union strikes and walk outs apply, absolutely

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!