The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  FMEA and Control Plans
  FMEA

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   FMEA
Behrooz
unregistered
posted 28 June 2000 02:46 AM           Edit/Delete Message   Reply w/Quote
Dear forum
I have a question about PFMEA. In FMEA manual published by AIAG, reduced "D" ranking by use "Preventative Maintenace". But in their instruction wrote that "preventative action" can reduce "O" ranking. Which is correct?

IP: Logged

Kevin Mader
Forum Wizard

Posts: 575
From:Seymour, CT USA
Registered: Nov 98

posted 28 June 2000 02:54 PM     Click Here to See the Profile for Kevin Mader   Click Here to Email Kevin Mader     Edit/Delete Message   Reply w/Quote
Interesting observation.

Is Prevention....Detection? By many standards, no.

By the usage in the FMEA, they associate Detection ratings with Current Process Controls (see the FMEA worksheet). As such, it will influence your D rating.

Occurence ratings are associated with the Process control. How often will a failure Mode occur if your Process Control is in place and functioning properly? As such, it also influences the O rating.

Perhaps both is the right answer. Anyone out there with more thought on this?

Back to the group...

Kevin

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 03 July 2000 11:29 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Dear Behrooz:

You're just trying to confuse us, yes??

Like Kevin said: If you increase preventive maintenance, it's (if it works - increasing PM is not always going to reduce failures) going to reduce the probability that the equipment will fail - thus reducing the Occurance rating.

[This message has been edited by Marc Smith (edited 03 July 2000).]

IP: Logged

Heather Clark
unregistered
posted 14 July 2000 11:27 PM           Edit/Delete Message   Reply w/Quote
The SAE J1739 standard lists 3 types of controls. 1) Prevent a cause or Failure Mode, 2) Detect a Cause, 3) Detect a Failure Mode. Type 1 controls prevent, and therefore as "current" process controls have already reduced the Occurrence to the value you predict in the Occurrence column. Type 2 & 3 controls detect, and that is what is considered for the rating in the Detection column. All PM efforts reduce Occurrence. If there were no other controls, then there would be no detection and the Detection rating would be 10.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!