The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  General ISO Topics
  Quality Manual Quandary

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Quality Manual Quandary
Mark Smith
Forum Contributor

Posts: 32
From:
Registered: May 99

posted 10 November 1999 10:04 AM     Click Here to See the Profile for Mark Smith     Edit/Delete Message   Reply w/Quote
Our quality manual contains a page that lists the previous revisions to the manual,a summary of the change, a reference to the change order number that contains the exact change in detail and an effective date.

while auditing the manual's changes I discovered that between rev D and E of the manual there was a change that did not get incorporated in the manual revision history!
Technically, this means that any subsequent revisions (3 of them) are actually off by one revision. What do I do to fix this? Do I just make another revision of the manual and include in the revision history page a description of this event? Do I need to go back to all the previous change records for the manual back to the time that this change should have been included in the history page and edit all the manuals? HEEEEEELLLPPP!

IP: Logged

Mike525
Forum Contributor

Posts: 49
From:
Registered: Apr 99

posted 10 November 1999 10:39 AM     Click Here to See the Profile for Mike525   Click Here to Email Mike525     Edit/Delete Message   Reply w/Quote
Mark:

It all depends on how masochistic you're feeling - you could go back and correct all of the revisions and make all of the corresponding changes - or, just make an entry on the revision history page, note the revision error, and go on with life. Just be sure you can show effective communication of the change, if relevant.

One way of looking at situations such as this is - what is the value added to the process if I do "x" or "y." If no value is added, and the quality of the product or customer satisfaction is not jeopardized, then minimze your efforts and simply note what actions were taken.

IP: Logged

Kevin Mader
Forum Wizard

Posts: 575
From:Seymour, CT USA
Registered: Nov 98

posted 10 November 1999 01:01 PM     Click Here to See the Profile for Kevin Mader   Click Here to Email Kevin Mader     Edit/Delete Message   Reply w/Quote
Mike is right. Fix it and communicate it (perhaps with the redistribution).

Mistakes will happen. Its a fact of life. The important thing here is that you caught it, evaluated all risk encountered, and corrected the issue.

Regards,

Kevin

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!