The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  APQP and PPAP
  PPAP Master Parts

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   PPAP Master Parts
Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 22 October 1998 09:26 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
The PPAP Manual states we must keep a master part and label it accordingly. Currently we keep 6 pieces from the PPAP,and the next production run we keep 6 new ones from that order and throw the old six away. None of them are specified as master parts.
Are we in compliance?

IP: Logged

Howard Atkins
Forum Wizard

Posts: 202
From:Israel
Registered:

posted 26 October 1998 02:34 AM     Click Here to See the Profile for Howard Atkins   Click Here to Email Howard Atkins     Edit/Delete Message   Reply w/Quote
There are 2 seperate issues as I see it.
PPAP master samples should be kept as examples of the parts submitted, the parts that you keep afterwards from production are to help you if you have a problem later with this specific production lot.
I would suggest that you keep more than the latest samples but at least a year or two backwards.
You must keep master samples seperately as a different subject

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 27 October 1998 06:36 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
My two cents worth here is to say talk to your customer's supplier QA activity and ASK what they want SPECIFICALLY. I say this because I have seen different requirements from customers. In one case PPAP sample retention time and number was dictated by the size of the part (in that case it was hoods which were metal stamped). Doesn't hurt to check with your customer.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!