The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  APQP and PPAP
  Bulk Materials Checklist

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Bulk Materials Checklist
jharding
Lurker (<10 Posts)

Posts: 3
From:
Registered: Jan 2000

posted 21 February 2000 12:39 PM     Click Here to See the Profile for jharding     Edit/Delete Message   Reply w/Quote
Looking for comments/suggestions regarding the new "bulk material supplier checklist".

The new edition 3 PPAP Manual contains needed clarification for bulk material suppliers. Also, it is true that the authors reordered the submission requirements (Table I.4.1) so to better compliment the "natural flow" of the real-world process. However, I find the addition of the bulk material requirements checklist (BMRC)to be confusing:

1.) The BMRC appears to be something that is agreed to (with the customer) up front. (e.g. deciding who will implement and when, a pre-launch control plan, etc.). Yet, in the so-called natural flow of the process, the checklist appears as element # 15 (Table I.4.1). Shouldn't the BMRC be listed at the top?

2.) What is the point of the checklist? Why aren't the submission requirements list and underlying new clarifications enough? Comments?

3.) If the bulk material was pre-existing, and then sampled into a new application, would such a checklist be required at all? Most of it seems to apply to a material that was designed for the first time for a specific application.

Thanks.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 24 February 2000 09:38 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Any comments, Howard? Or anyone else?

IP: Logged

Per Josefsson
unregistered
posted 17 March 2000 09:29 AM           Edit/Delete Message   Reply w/Quote
Hi!
Just found this site and I have to say that this Forum is both interesting and educating.
Sorry jharding - as quiet new in this game I can not answer your question, but mayby you or anyone else are able to answer mine:
My swedish company produce non-woven in big rolls to the automotive industry. Our customers manufacture these into for example Battery Covers and Dash Insulators. Are our products considered as Bulk Material?
Best regards,
Per Josefsson

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!