The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  APQP and PPAP
  Interim PPAPs

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Interim PPAPs
Alan Greatbatch
Forum Contributor

Posts: 17
From:Neuch‰tel, Switzerland
Registered: Sep 1999

posted 24 March 2000 08:16 AM     Click Here to See the Profile for Alan Greatbatch   Click Here to Email Alan Greatbatch     Edit/Delete Message   Reply w/Quote
Have any of you guys had to submit 'Interim PPAPs'?
I have a customer, whose end customer is part of the GM conglomerate, that demands an interim PPAP. Which, basically, is a PPAP with some documents missing. We shipped pre-production parts (electronic components) and now have been asked for an interim PPAP consisting of all the documents that we have for a full PPAP plus a timing plan for documents that are not yet ready (R&R studies, Cp&Cpk data, reliability data etc.)plus completion of the "GM-1411 Interim recovery worksheet" (which sadly is not the latest revision on their own website). Is this normal for GM, triplication of paperwork?

------------------
Alan Greatbatch

IP: Logged

Christian Lupo
Forum Contributor

Posts: 117
From:Auburn, NY
Registered:

posted 24 March 2000 09:39 AM     Click Here to See the Profile for Christian Lupo   Click Here to Email Christian Lupo     Edit/Delete Message   Reply w/Quote
I dont think there is anything "normal" about GM's procedures, and the situation you described does not surprise me. My experience w/GM is: The requirements GM places on your company are SQE/A dependant. I know GM suppliers that have been working from "interim" PPAP's for years! It is not uncommon for a SQE/A to accept a PPAP just to have that persons successor reject it.

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 24 March 2000 11:25 AM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
quote:
Originally posted by Alan Greatbatch:
Have any of you guys had to submit 'Interim PPAPs'?
and now have been asked for an interim PPAP consisting of all the documents that we have for a full PPAP plus a timing plan for documents that are not yet ready (R&R studies, Cp&Cpk data, reliability data etc.)plus completion of the "GM-1411 Interim recovery worksheet" (which sadly is not the latest revision on their own website). Is this normal for GM, triplication of paperwork?


I've done plenty of interim PPAP's. The interim worksheet should serve as the Timing
Plan. Unless there are so many issues that a separate plan was requested. As for "is this normal for GM, triplication of paperwork? Seems to happen quite often anyways....


IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!