  APQP and PPAP
  PPAP required by customer not same as PPAP

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   PPAP required by customer not same as PPAP
cjkurtz
Lurker (<10 Posts)

Posts: 6
From:
Registered: Dec 98

posted 19 September 2000 04:22 PM     Click Here to See the Profile for cjkurtz   Click Here to Email cjkurtz     Edit/Delete Message   Reply w/Quote
Truck Ind. customer requires PPAP's done to their requirements. No other customer requires PPAP. Since we can meet the customer-specific PPAP requirements, what else do we need to do to show QS auditors we meet the PPAP requirements. Do we have to do a PPAP (unsubmitted)to the book just to show we can?

Also, there are NO customer key/critical product or process characteristics. Do you have to do any capability studies, just to show you can do it if you have to?

IP: Logged

Sam
Forum Contributor

Posts: 244
From:
Registered: Sep 1999

posted 19 September 2000 05:32 PM     Click Here to See the Profile for Sam   Click Here to Email Sam     Edit/Delete Message   Reply w/Quote
1- Yes, you have to do a PPAP to comply with the requirement. refer to 4.2.4.1 of the QSR.

2- I interpret the requirement for Cpk as applicable to customer designated special characteristics, however, be prepared to discuss your case with the auditor,Cpk is part of the process of knowing when your process is in or out of control.

IP: Logged

Howard Atkins
Forum Wizard

Posts: 202
From:Israel
Registered:

posted 20 September 2000 04:52 AM     Click Here to See the Profile for Howard Atkins   Click Here to Email Howard Atkins     Edit/Delete Message   Reply w/Quote
There is a claim by some customers that any parameter that you control becomes a CC.
In general I have only submitted CPK for CC on the customer drawing and have never had any problem with that.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!