|
This thread is carried over and continued in the Current Elsmar Cove Forums |
|
The Old Elsmar Cove Forums
![]() Software Quality Assurance
![]() Data/Drawing Control
|
| next newest topic | next oldest topic |
| Author | Topic: Data/Drawing Control |
|
Steph Forum Contributor Posts: 20 |
I'm no computer buff, so this is going to be in very simple terms. Is it exceptable to have all data/drawing files and manufacturing sub-systems for a plant being controlled by a head-office server? This head-office is not certfied to any standard. Administration rights are given to only a select few at the head-office and they also do the back-up. The head-office has no operation procedures of work instructions. IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
I don't see any problem with this. I would have something that indicates they backup the data files. IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
|
Your Input Into These Forums Is Appreciated! Thanks!
