The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Welcome To The Old Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums


  The Old Elsmar Cove Forums
  TQM - Total Quality Management
  HELP WITH T.Q.M.!!!

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   HELP WITH T.Q.M.!!!
Antonio
unregistered
posted 07 March 2000 01:24 PM           Edit/Delete Message   Reply w/Quote
Can anyone help me with the problem of the relationship between T.Q.M. methods(i.e. Q.F.D.; Taguchi methods; D.O.E.;Value Engineering; F.M.E.A.;etc.)and the flow chart of product design(methodical design).

Thanks in advance
Antonio

IP: Logged

Alan Cotterell
Forum Contributor

Posts: 120
From:Benalla, Victoria, Australia
Registered: Oct 1999

posted 08 March 2000 06:28 PM     Click Here to See the Profile for Alan Cotterell   Click Here to Email Alan Cotterell     Edit/Delete Message   Reply w/Quote
I suggest the relationship between TQM and the other areas you mention comes from the 'act' part of the plan, do , check, act cycle.
To implement TQM without a documented management system in place is futile. The act part of the cycle is, in my opinion, to update procedures to include gains achieved through the TQM activity.
The documented management system should also give policy guidance and allow workers to substantially self-manage.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 08 March 2000 08:38 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I'm not sure what you mean. TQM is, as you have noted, a series of tools. You state there is a problem in the relationship of TQM (a series of tools) and methodical design. TQM tools are typically tools applied to in-process scenarios.

Can you explain what you believe the 'problem' (I assume you are saying there is a contradiction between the two) is?

IP: Logged

Antonio
unregistered
posted 14 March 2000 02:13 AM           Edit/Delete Message   Reply w/Quote
HI!,
first of all I want to apologize for the misunderstanding. there's no 'problem' indeed with T.Q.M..
The point is I'm studing the T.Q.M. tools, and I read in a book about the relation of these tools with the different steps of the product design.For example, it was suggested to use Robust Design with the "detailed design of the product" or it was the best to use D.O.E. in the confirmatory study. but it was not very clear to me the reasons of it all, so I wandered if there were some books (cheap's better!!)or some web sites to go into this matter!
thank you
Antonio
P.S. I apologize again for my bad English!
I will improve it. I promise!!

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 19 March 2000 07:18 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Two TQM links from Don:

Anyway, on to the TQ stuff: Try
http://web5.whs.osd.mil/educationa.htm
and http://esc.ttrc.doleta.gov/simplyb/index2.htm

Best Regrds,
Don

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


UBB 5.45c

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!