|
This thread is carried over and continued in the Current Elsmar Cove Forums |
|
The Old Elsmar Cove Forums
![]() AS 9100
![]() AS9000 para 4.10.2.4
|
| next newest topic | next oldest topic |
| Author | Topic: AS9000 para 4.10.2.4 |
|
Marc Smith Cheech Wizard Posts: 4119 |
Subject: Re: Q: AS 9000 4.10.2.4/Wheeler/Westall Date: Thu, 19 Nov 1998 09:28:34 -0600 From: ISO Standards Discussion From: Greg Westall >From: "Douglas Wheeler" >Douglas Wheeler The AS9000 Appendix 1 checklist states on page 46 for element AS 4.10.2.4: "When certifications are used as a means of product acceptance, procedures shall document the types and frequencies of analyses to validate certification." The key word here is "validate". Some situations require that receiving inspection consist of physical product inspection and test. When you accept based on certification, you need to periodically "inspect" those certifications. Various methods may include measuring the product to insure that dimensions are within specification or physical testing of mechanical properties to confirm certification statements. How often you do it should be based on the product, the customer, and your vendor. But you need to have a documented procedure in any case. Hope this helps. Greg Westall, CQA IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
|
Your Input Into These Forums Is Appreciated! Thanks!
