The Elsmar Cove Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page                 

Go Back   The Elsmar Cove Discussion Forums > Elsmar Cove Quality Assurance and Business Standards Wiki

Related








Process Capability Index

From Elsmar Cove Quality Assurance and Business Standards Wiki

Process Capability is required by TS 16949 and is part of the typical APQP process. Process Capability compares the output of an in-control process to the specification limits by using capability indices. The comparison is made by forming the ratio of the spread between the process specifications (the specification "width") to the spread of the process values, as measured by 6 process standard deviation units (the process "width").

Process Capability Indices - Examples: Cp, Cpk, and Cpm

A process capability index uses both the process variability and the process specifications to determine whether the process is "capable" We are often required to compare the output of a stable process with the process specifications and make a statement about how well the process meets specification. To do this we compare the natural variability of a stable process with the process specification limits. A capable process is one where almost all the measurements fall inside the specification limits. There are several statistics that can be used to measure the capability of a process: Cp, Cpk, Cpm. Most capability indices estimates are valid only if the sample size used is 'large enough'. Large enough is generally thought to be about 50 independent data values.

Typically:

Cp = Process Capability. A simple and straightforward indicator of process capability.

Cpk = Process Capability Index. Adjustment of Cp for the effect of non-centered distribution.

Pp = Process Performance. A simple and straightforward indicator of process performance.

Ppk = Process Performance Index. Adjustment of Pp for the effect of non-centered distribution.


See this animated visual of Process Capability - Cp vs. Cpk for a more detailed explaination and a visual animation which shows the relationship.

Elsmar Cove forum Process Capability discussion threads

The Elsmar Cove Wiki SideBar!
Sponsor Links

$ Contributor Forum Access

The time now is 06:02 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user.
Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
513 777-3394
The Elsmar Cove Web Site is *CopyFree*