SMED - The term used to represent the Single Minute Exchange of Die or setup time that can be counted in a single digit of minutes. SMED is often used interchangeably with “quick changeover”. SMED and quick changeover are the practice of reducing the time it takes to change a line or machine from running one product to the next.

The aim of applying the SMED methodology is to systematically reduce the time lost in production for machine set-ups from hours (or sometimes days!) to minutes.

It applies to almost every production situation - machining, moulding, extrus ion, painting, assembly, fabrication, forming, casting, food processing, bottling, etc, etc.

The successful implementation of SMED and quick changeover is the key to a competitive advantage for any manufacturer that produces, prepares, processes or packages a variety of products on a single machine, line or cell. SMED and quick changeover allows manufacturers to keep less inventory while supporting customer demand for products with even slight variations. SMED has a lot of hidden benefits that range from reducing WIP to faster ROI of capital equipment through better utilization.

To understand how SMED can help we have to look at the changeover process. Typically when the last product of a run has been made the equipment is shut down and locked out, the line is cleaned, tooling is removed or adjusted, new tooling may be installed to accommodate the next scheduled product. Adjustments are made, critical values are met (die temperature, accumulators filled, hoppers loaded, etc.) and eventually the startup process begins – running product while performing adjustments and bringing the quality and speed up to standard. This process takes time, time that can be reduced through SMED.

Effective SMED programs identify and separate the changeover process into key operations:

External Setup involves operations that can be done while the machine is running and before the changeover process begins.

Internal Setup aspects are those that must take place when the equipment is stopped.

Aside from that, there may also be non-essential operations. The following is a brief example of how to attack the SMED process:

• Eliminate non-essential operations – Adjust only one side of guard rails instead of both, replace only necessary parts and make all others as universal as possible.

• Perform External Set-up – Gather parts and tools, pre-heat dies, have the correct new product material at the line – there's nothing worse than completing a changeover only to find that a key product component is missing.

• Simplify Internal Set-up – Use pins, cams, and jigs to reduce adjustments, replace nuts and bolts with hand knobs, levers and toggle clamps – remember that no matter how long the screw or bolt only the last turn tightens it.

• Measure, measure, measure – The only way to know if changeover time and startup waste is reduced is to measure it.

Always measure time lost to changeover and any waste created in the startup process so that you can benchmark improvement programs.

The Elsmar Cove Wiki SideBar!
Sponsor Links

$ Contributor Forum Access

The time now is 06:09 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user.
Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
513 777-3394
The Elsmar Cove Web Site is *CopyFree*