The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Elsmar Cove Quality Assurance and Business Standards Wiki

Related






Process Audit

From Elsmar Cove Quality Assurance and Business Standards Wiki

Revision as of 09:59, 17 April 2006 by WikiSysop (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)

Process Audit - There are several types of Process Audits.

A Manufacturing Process Audit uses the Control Plan and Work Instructions as the audit criteria, following the Process Flow Chart 'down stream' or 'up stream'.

A Layered Process Audit (both DCX and GM/Delphi have used them) is a check by 'layers' of management to see if Work Instructions are being followed (mainly since DCX, the loudest proponent of LPA's don't utilize Control Plans as their suppliers do). The Layered Process Audit focus is getting 'issues' escalated to higher management to get them resolved.

The QMS (Quality Management System) process audit

  • Audit preparation – establishing controlled conditions; undertaking the ‘virtual’ audit; concepts of the Audit Check List.
  • Dealing with processes that do not have documented procedures.
  • Identify main process activities and Support Processes.
  • Evaluating the use of ‘core tools’ and customer-specific requirements.
  • Linking processes to ISO/TS 16949:2002 clause requirements.
  • Developing an effective Audit Check List.
  • Working with Turtle Diagrams and Process Maps.
  • Dealing with ‘what if’ and infrequent situations.
  • Developing probing automotive audit questions from QMS documentation.
  • Develop Audit Check List(s).
  • Using check-lists in the design, development and manufacturing environment – Search for objective evidence.
  • Incorporate internal laboratory requirements.
  • Conducting the audit – the entry meeting; questioning techniques; open and closed questions; active listening; recording the evidence; making your decision (conformance/nonconformance); categorizing nonconformances.
  • Presenting audit findings – preparing nonconformance notes; the exit meeting; working with executive management.
  • Address the findings – delineation of the roles of the auditor and management; determining root cause(s) and actions; recording corrective actions; monitoring implementation.
  • Close out the audit – follow-up activities; the need for a follow-up audit; dealing with tardiness and ineffective corrective actions; preparing an audit (summary) report.
  • Scheduling Internal Audit s – planning audits (understanding the criteria)
  • Designing a effective and user-friendly audit planner; tracking progress; updating the audit planner.
  • Audit results input to management review and their role in continual improvement

The Manufacturing process audit

  • Definition of a Manufacturing Process Audit – objectives of the audit; what must be established; working with ‘big rules’; determining that the entire manufacturing process is capable.
  • Applying a manufacturing process audit to verify that ISO/TS 16949:2002 mandatory requirements are met.
  • Mapping the major manufacturing process activities – using the manufacturing Process Flowchart Operator factors; Customer complaints/problems; Part certification requirements.
  • Manufacturing process audit preparations – identifying the essential documents and information (e.g. the PPAP file; product engineering specification; production and inspection information; FMEAs, Control Plans; set-up specification; Work Instructions; etc).
  • Check identified documents and records.
  • Check part approval and capability of special characteristics.
  • Check for customer complaints and internal/external ‘problems’.
  • Check manufacturing sequence.
  • Determine the manufacturing sequence – swim-lane process mapping and process layout diagrams – validating the process flowchart/layout.
  • Generic manufacturing process audit questionnaire – customizing a questionnaire
  • Assessing customer satisfaction with the part – part quality, delivery performance, customer disruptions, customer notifications (quality and delivery issues), etc.
  • Opening meeting.
  • Conducting the audit – the need for a photographic record.
  • Recording evidence as-you-go – feedback to production personnel.
  • Dealing with ‘recalls’, ‘notifications’ and ‘service concerns’.
  • Evaluation and reporting – responsibilities for action.
  • Presenting the results—management, supervision, operators.
  • Verification of Corrective Actions.
  • Follow-up activities and manufacturing process audit closure.

Some Elsmar Cove Forum Process Audit discussion threads

The Elsmar Cove Wiki SideBar!
Sponsor Links





$ Contributor Forum Access

The time now is 04:47 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*