8-Disciplines Problem Solving
Objective
Define and implement the best permanent
corrective actions. Choose
on-going controls to ensure the root cause is eliminated. Once in production, monitor the long-term effects and
implement contingency
actions, if necessary.
Identify
Alternative Solutions
•Evaluate how other groups solved similar problems.
•Use brainstorming to generate Alternate Solution C&E
diagram.
•Consider redesign of the part or process to eliminate the
problem.
•Anticipate failure of the solution. Develop contingency
action(s).
Implement
Solution
•Use an action plan approach to implement the solution.
•Test and verify contingency actions, if possible.
Implement Permanent CA Objective