Slide 211 of 241
DFMEA
Control Plan
Early Production Containment Plan (Pre-Launch Control Plan)
Process capability studies
Gage Measurement System Analysis
Lab Accreditation & scope
Restricted & Reportable Materials form
Interim Worksheet, if required
Supplier Data Received
Warrant
Appearance Approval Report (AAR), as required
Sample Parts
Print/Design Record
Engineering Change Documents
Check fixtures/aids
Process Flow Diagram
PFMEA
APQP
Forum Discussions
The. Deming PDCA Cycle
QMS Implementation
FMEA Information
APQP Information
Auditing Information
8-D Problem Solving
Statistics
Error Proofing (Poka Yoke)
Brainstorming
Identifying Waste
Pull Systems
Lead Time Reduction
Planned Maintenance
Quick Setup
Discovering Change
Process Capability - Cp vs. Cpk
Histogram. Animation
Process Loop Animation
Taguchi Loss Function
Fishbone / Cause and Effects Animation
The Elsmar Cove Privacy Policy and Statement - May 2017