Effects of Changing the Process FMEA

PFMEA

Work Instruction

Design Change

Control Plan

And

Other Action

A change in the severity of the effect of a potential problem can only be effected through a design change.

When making a change to a document, it is important to consider the effects of that change on other documents. Typically the engineering change system in a company and/or corrective action system ensures these occur. But this is not always the case. Review your company engineering change procedure / system and see if it does so.