* Proactive Maintenance actions are key preventive, predictive, and visual management tools to control the reliability of machinery. Preventive maintenance schedules, procedures, and in-plant resources are valid design controls to reduce the occurrence ratings of the machinery FMEA, only if they have been developed as part of the design process, and are included in the machinery user�s manual.
Note: The Machinery Design Engineer�s goal is to make the design robust so that machinery controls are not required. The Machinery Design Engineer must not rely on machinery controls or control plans to overcome potential design weaknesses.