Fault Tree Construction Steps Summary
Determine the level to which the examination should be constructed
Begin with the system-level fault
Fully describe all events which immediately cause this event
With each lower-level fault, continue describing its immediate causes until a component level failure or human error can be attributed to the fault
Previous slide
Next slide
Back to first slide
View graphic version
FMEA and Control Plans
Forum Discussions
The. Deming PDCA Cycle
QMS Implementation
FMEA Information
APQP Information
Auditing Information
8-D Problem Solving
Statistics
Error Proofing (Poka Yoke)
Brainstorming
Identifying Waste
Pull Systems
Lead Time Reduction
Planned Maintenance
Quick Setup
Discovering Change
Process Capability - Cp vs. Cpk
Histogram. Animation
Process Loop Animation
Taguchi Loss Function
Fishbone / Cause and Effects Animation
ADVERTISEMENT
View the Elsmar Cove
Privacy Policy
and
Terms and Conditions