P
PVMRS
if the root cause for a process validation batch failure of nth stage is a critical material attribute of previous intermediate (n-1 stage) and there is no process modification in nth stage is required as a corrective action (specification tightening of n-1 stage is required to prevent the failure), will the nth stage process validation considered as complete or need to repeat the nth stage validation?