snoopy2017
Hi everyone,
When we implement a DHF for the first time , does it have to through change control? I have noticed in a couple of companies, that the first version of the DHF (including all the necessary docs) are not assigned a change control number. But subsequent changes to the DHFs are assigned an ECO number and a change control number. Can somebody please clarify for me when change control is required for DHF? Does the first version of DHF need change control #?
Thank you!
When we implement a DHF for the first time , does it have to through change control? I have noticed in a couple of companies, that the first version of the DHF (including all the necessary docs) are not assigned a change control number. But subsequent changes to the DHFs are assigned an ECO number and a change control number. Can somebody please clarify for me when change control is required for DHF? Does the first version of DHF need change control #?