Situation:
- design record of purchased part contains 18 functional requirements (temperature resistance, etc.)
- design record says that 12 of them shall be tested annually
- supplier is providing me a PPAP with Performance test results for 12 requirements
I am rejecting the PPAP and saying to supplier: hey, there are 6 requirements missing.
Supplier's response: hey, we don't have to test the other 6, because the design record is saying that we have to test only 12 requirements out of 18
I am preparing my response: hey Supplier, you are wrong, see PPAP manual clause number... and then I open the PPAP manual in order to check for clause number and see in clause 2.2.10 that supplier shall have performance tests results for tests specified in design record. For tests, not for requirements specified in design record. Does it mean that my supplier is right and they only have to submit 12 test results?
On the other hand: they have test methods described in design record for 15 requirements out of 18, which makes it even more crazy...
So how many test results they must submit to me:
- 18, because this is the full list of requirements from design record
- 15, because test method is described only for 15 of them
- 12, because design record is saying that they shall test only 12 of them
Thank you very much in advance for your replies because I'm lost here...
- design record of purchased part contains 18 functional requirements (temperature resistance, etc.)
- design record says that 12 of them shall be tested annually
- supplier is providing me a PPAP with Performance test results for 12 requirements
I am rejecting the PPAP and saying to supplier: hey, there are 6 requirements missing.
Supplier's response: hey, we don't have to test the other 6, because the design record is saying that we have to test only 12 requirements out of 18
I am preparing my response: hey Supplier, you are wrong, see PPAP manual clause number... and then I open the PPAP manual in order to check for clause number and see in clause 2.2.10 that supplier shall have performance tests results for tests specified in design record. For tests, not for requirements specified in design record. Does it mean that my supplier is right and they only have to submit 12 test results?
On the other hand: they have test methods described in design record for 15 requirements out of 18, which makes it even more crazy...
So how many test results they must submit to me:
- 18, because this is the full list of requirements from design record
- 15, because test method is described only for 15 of them
- 12, because design record is saying that they shall test only 12 of them
Thank you very much in advance for your replies because I'm lost here...