L
Lorenzo36
Hello folks,
Ok, production equipment and tools are being validated, it's evident through my observations. Nonetheless, it's not being documented and there is no "documented procedure" as required per the standard (AS9100 7.5.1.3). I've been asked to help production create a procedure, however I would like to see (if ya'll don't mind) how some of ya'll addressed this section of the standard. As I wrote in a previous thread, AS9100 is new to me, most of my career has been in the Oil and Gas (ISO/PED/ASME/API, etc). Any help is much appreciated. Thanks in advance.
Ok, production equipment and tools are being validated, it's evident through my observations. Nonetheless, it's not being documented and there is no "documented procedure" as required per the standard (AS9100 7.5.1.3). I've been asked to help production create a procedure, however I would like to see (if ya'll don't mind) how some of ya'll addressed this section of the standard. As I wrote in a previous thread, AS9100 is new to me, most of my career has been in the Oil and Gas (ISO/PED/ASME/API, etc). Any help is much appreciated. Thanks in advance.