Hello Everyone,
This is Jacobo from a mysterious corner of the world, and it is my first thread in this forum, I'm a heat treater in aerospace field.
Currently I'm involved with the commissioning of a Vacuum Heat Treat furnace(60x600x900mm), but we have a TUS problem at one temperature, the last TUS sensor entered the lower limit in 60 minutes.
In accordance with 2750 E Clause 3.5.17.13[The time required to achieve recovery, stabilization, or recurrent temperature pattern did not exceed the time limit specified in any applicable process specifications.], I asked our supplier to meet the requirement of 30 minutes, do you guys have quantitive time of this requirement? Or may someone supply a customer specification(GE RR) on hand?
Thank you
This is Jacobo from a mysterious corner of the world, and it is my first thread in this forum, I'm a heat treater in aerospace field.
Currently I'm involved with the commissioning of a Vacuum Heat Treat furnace(60x600x900mm), but we have a TUS problem at one temperature, the last TUS sensor entered the lower limit in 60 minutes.
In accordance with 2750 E Clause 3.5.17.13[The time required to achieve recovery, stabilization, or recurrent temperature pattern did not exceed the time limit specified in any applicable process specifications.], I asked our supplier to meet the requirement of 30 minutes, do you guys have quantitive time of this requirement? Or may someone supply a customer specification(GE RR) on hand?
Thank you
Last edited by a moderator: