Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

Design Verification - Managing Changes


Elsmar XML RSS Feed
Elsmar Cove Forum RSS Feed

Monitor the Elsmar Forum
Sponsor Links




Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
change management, design verification, fda (food and drug administration), protocols (medical device term - also see procedures), requirements and specifications, verification (general)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 13th February 2018, 02:34 AM
jamesmiller

 
 
Total Posts: 1
Please Help! Design Verification - Managing Changes

Hello Folks,

Wanted to know your opinion on the following scenario

I am in the middle of a design verification and found our that there are two different issues

1. A test failed because the requirement was written wrongly, instead of raising an alarm at 10 seconds, it raised at 20 seconds - but the correct requirement is indeed 20 seconds.

Now in my root cause analysis and resolution, i have to change my requirement to say 20 seconds AND amend the protocol - do I need to rerun my test again ? If the answer is No, then my dates of protocol will be "later" than my dates of execution. Will this be viewed as "fix the spec" than fix the design ?

If I do this, is there a potential design control violation ?

2. Similar as above case, (for a completely different requirement) but this time my protocol was written wrongly and test HAS completed execution and failed, due to a incorrect protocol. Do I just amend the protocol and refer to old results ?

Common sense says, yes - but is there any violation of quality requirements from FDA/CE perspective ?

thank you in advance!

Sponsored Links
  Post Number #2  
Old 13th February 2018, 01:20 PM
John Broomfield's Avatar
John Broomfield

 
 
Total Posts: 2,526
Lightbulb Re: Design Verification - Managing Changes

Quote:
In Reply to Parent Post by jamesmiller View Post

Hello Folks,

Wanted to know your opinion on the following scenario

I am in the middle of a design verification and found our that there are two different issues

1. A test failed because the requirement was written wrongly, instead of raising an alarm at 10 seconds, it raised at 20 seconds - but the correct requirement is indeed 20 seconds.

Now in my root cause analysis and resolution, i have to change my requirement to say 20 seconds AND amend the protocol - do I need to rerun my test again ? If the answer is No, then my dates of protocol will be "later" than my dates of execution. Will this be viewed as "fix the spec" than fix the design ?

If I do this, is there a potential design control violation ?

2. Similar as above case, (for a completely different requirement) but this time my protocol was written wrongly and test HAS completed execution and failed, due to a incorrect protocol. Do I just amend the protocol and refer to old results ?

Common sense says, yes - but is there any violation of quality requirements from FDA/CE perspective ?

thank you in advance!
James,

It seems to me that your design verifications have discovered a nonconformity in the spec writing process for which you need to take corrective action.

But the product design itself may fulfill the performance requirements, is that right?

Your design team's risk assessment should determine whether to proceed to design validation or to replan the design verification to start again.

John
  Post Number #3  
Old 13th February 2018, 05:14 PM
yodon

 
 
Total Posts: 1,046
Re: Design Verification - Managing Changes

To add on to John's post, ensure you establish the linkage across everything done. The issues should be tied to your NC / problem report and the problem report tied to the actions / corrections / rationale / justification.

Not being able to connect the dots is when things get uncomfortable.
  Post Number #4  
Old 13th February 2018, 07:23 PM
Ninja's Avatar
Ninja

 
 
Total Posts: 877
Re: Design Verification - Managing Changes

Big factor in this is "How much does it cost?"

If it's a 20sec test...just rerun it and take the questions away.
If it means a line shutdown to trigger it, costing tens of thousands...do the paperwork again...
This is a cost/benefit decision...
(assuming that a customer hasn't said otherwise)
  Post Number #5  
Old 14th February 2018, 02:46 PM
Candi1024

 
 
Total Posts: 111
Re: Design Verification - Managing Changes

For both of these situations, you create a deviation and explain what the change is and why it is acceptable. After you approve the report, you should go back and change the protocol if you ever plan to use it again. Do not modify the protocol, then attach old results.
Thanks to Candi1024 for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Design Input/Output and Design V&V (Verification and Validation) Interpretations dweebie 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 14 3rd January 2014 05:45 PM
Form that will satisfy Design Review and Design Verification Requirements (7.3) Haddad9921 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2 7th November 2013 07:38 PM
Determining Sample Size for Design Verification and Design Validation edisoar Other Medical Device and Orthopedic Related Topics 20 3rd December 2012 07:32 PM
Is Ship Test considered Design Verification or Design Validation? bullfrog 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2 12th August 2011 01:32 PM
Design Verification - Design outputs not verified against customer requirements Bill Rudnicki Design and Development of Products and Processes 6 19th July 2007 05:25 PM