Hi, all
I´m adding forms and WI´s and have the next question
Normally, I assign a doc number to a procedure in this way:
PR-ENG-001 Means procedure of Engineering area and consecutive,
in the last days have had the need to create Wi´s depending from this procedure, so I do this
for this WI number, I use W1-PR-ENG-001 for other WI, is W2-PR-ENG-001 and so on.
Wil be a case where a WI is not hanged up from a Procedure?
In this case I´ll break my rule and maybe I could use
WI-ENG-001.
Are there really cases where WI´s have not parents?
Thanks
I´m adding forms and WI´s and have the next question
Normally, I assign a doc number to a procedure in this way:
PR-ENG-001 Means procedure of Engineering area and consecutive,
in the last days have had the need to create Wi´s depending from this procedure, so I do this
for this WI number, I use W1-PR-ENG-001 for other WI, is W2-PR-ENG-001 and so on.
Wil be a case where a WI is not hanged up from a Procedure?
In this case I´ll break my rule and maybe I could use
WI-ENG-001.
Are there really cases where WI´s have not parents?
Thanks