gavin.D
Hello everyone,
I'm hoping someone can offer some guidance on this one.
We're a civil engineering consultancy. Clients come to us looking for a design (requirements in an email or over the phone). They will usually send on some information such as ground information, drawings, lab data etc. We do a design based on this information and requirements. It always varies and you can never slap a design from one site onto another.
I'm wondering how you would approach the requirements for Clause 8.2-8.6 because it seems to me that we would have to produce a lot of records for every project we do (no matter how small) because every project is a new design.
We have a checking/sign off procedure to ensure work is checked before it goes out but very little apart from that. I'm trying to set up a QMS but minimise the records required while staying in compliance with the standard.
Thanks for taking the time to read this. I'm very interested in your recommendations.
I'm hoping someone can offer some guidance on this one.
We're a civil engineering consultancy. Clients come to us looking for a design (requirements in an email or over the phone). They will usually send on some information such as ground information, drawings, lab data etc. We do a design based on this information and requirements. It always varies and you can never slap a design from one site onto another.
I'm wondering how you would approach the requirements for Clause 8.2-8.6 because it seems to me that we would have to produce a lot of records for every project we do (no matter how small) because every project is a new design.
We have a checking/sign off procedure to ensure work is checked before it goes out but very little apart from that. I'm trying to set up a QMS but minimise the records required while staying in compliance with the standard.
Thanks for taking the time to read this. I'm very interested in your recommendations.