Hi george1weiss,
Many thanks for your deteailed explanation!
In an expansion to the previous discussions, I find myself having difficulty using a VSM to describe a production process which contains several automated machines which operate in series/parallel with each other and in series with a combined manual / automated operation in a cell utilizing a single operator.
Each of automated machines have unequal processinging times
mach 1 - 1 min,
mach 2 -5 min,
mach 3 -1 min
Each machine 1-3 includes a 1 unit buffer to hold a completed unit available to the operator for processing.
Once each of the buffers are full, the operator, using the unit in mach 3 buffer, initiates the manual/ automated process of mach 4 which takes several steps and contains several periods of wait time during which the operator moves material through the mach 3, mach 2, mach 1 cycles, utilizing, in this sense, SMED principles to allow the processing times of mach 1-3 to be aborbed by the time required for the operations of mach 4
Use of the VSM to show cycle time, total cycle time, process time, for this cell and yet be fully descriptive of each machine is where I have difficulty, except if I show the cell as having all of the machines in parallel with each other and report the cell cycle time in addition. Any comments anyone?