The Cove Business Standards Discussion Forums
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

Line Balance Study and maybe Takt Time and Cycle Time

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
cycle time, lean manufacturing, line balancing, takt (cycle) time
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 3rd October 2012, 01:44 PM
jkittle

 
 
Total Posts: 169
Please Help! Line Balance Study and maybe Takt Time and Cycle Time

I have a question about line balancing and maybe Takt time and Cycle time play into this as well.

The main question I have if youíre trying to conduct a line balancing study, do include queue times.

For example if I have a primer that has to set for 10 minutes before adding adhesive do I include this in the cycle time/line balance study. I also have a time of 2 hours that parts must remain in a clamped position before going to a test stand.

Are these times included in the cycle time as well as part of the line balance study?

Thank you for your help.
Jerry

Sponsored Links
  Post Number #2  
Old 3rd October 2012, 02:09 PM
onestout

 
 
Total Posts: 10
Re: Line Balance Study and maybe Takt Time and Cycle Time

I'm sure someone with more experience will chime in with a better answer but what I have done is to set up the curing (in your example) as a seperate process. This way you can see that the machine isn't actually tied up. If you have the space you could run several different parts through the one machine and have them curing in different areas. If you combine the curing with the machine then it looks like the machine is only capable of 1 piece per hour vs. 5 min. to apply and 55 min. to cure. There are many other factors that could change this such as it needs to stay in a fixture for 10 min. But this is how I have done it.
Thank You to onestout for your informative Post and/or Attachment!
  Post Number #3  
Old 9th October 2012, 09:36 PM
Adam.m

 
 
Total Posts: n/a
Re: Line Balance Study and maybe Takt Time and Cycle Time

First of all you need to determine what you are actually measuring.

Is it and their calculations:

a. Machine time - Uptime (production) vs. Downtime
b. Process time - Lead time of product per step and total
c. Man (person) time - Productive time and non productive

Each has it's separate calculation and opportunities. If you indicate which one you are after I can provide more information.
  Post Number #4  
Old 10th October 2012, 12:58 PM
Bev D's Avatar
Bev D

 
 
Total Posts: 3,631
Re: Line Balance Study and maybe Takt Time and Cycle Time

"Queue" time is when the product is just sitting with nothing happening to it. It isn't inlcuded in lien balance calculations. (It IS included in total cycle time calculations)

What you describe is process time. When I have these kinds of processes I do seperate them out as different processes.

The idea of line baalnce of course is that all processes take the same amount of time and that time is equal to takt time. (Make sure you have the right definition/formula fo rtakt time - there are a lot of misconceptions about this critical calculation) If process time is = takt time (and you have no defects and you are pulling into the process not pushing) you won't have any queue time.

Sometimes a process can't be broken down to smaller increments to achieve line balance. This is when you use the concept of 'toll booths'. Parallel processing of units through longer process times are staggered into the shorter process. The stagger is equal to takt time...
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Takt time and crew-to-takt concerns leanpractice Lean in Manufacturing and Service Industries 3 11th March 2015 06:05 AM
Use TAKT time to optimize output of line - TAKT Time .xls qianzhongmin Lean in Manufacturing and Service Industries 4 20th November 2013 08:43 PM
Takt Time vs. Cycle Time vs. Total Cycle Time tomccchang Lean in Manufacturing and Service Industries 29 28th November 2011 12:28 PM
Takt Time & Cycle Time Calculations paxbritannia Lean in Manufacturing and Service Industries 6 30th September 2011 03:57 PM
Time Study, Line Balancing, Elemental Analysis, Line Efficiency - Software to use? krrish Quality Tools, Improvement and Analysis 13 6th May 2009 02:52 PM



The time now is 04:38 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"