Understanding Cycle Time - Why the time of the other activities are left out

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
cycle time
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 4th January 2017, 11:53 AM
zaffresky

 
 
Total Posts: 2
Please Help! Understanding Cycle Time - Why the time of the other activities are left out

Hi everyone. I am a new member of this forum and currently learning industrial engineering concepts on my own. I look up the definitions online but at times I couldn't get it. For instance, a lot of online resources mention that cycle time is determined by the slowest activity or task (aka bottleneck) in the process. I do understand that cycle time will be a function of bottleneck but why the time of the other activities that constitute the process are left out. I believe the cycle time should be the sum of all process activities?

Can anyone please help me understand that?

Sponsored Links
  Post Number #2  
Old 4th January 2017, 12:45 PM
normzone

 
 
Total Posts: 765
Re: Understanding Cycle Time - Why the time of the other activities are left out

Welcome to the forum, [zaffresky].

I don't know that I can help you, but I also have some interest/questions in that area, so I'll contribute to the confusion in that manner, and somebody will be along shortly who knows what they are talking about. Perhaps from your studies you can help me out.

I'm going to guess that there are different methods of referring to cycle time, and the method you reference (including the time of ALL process activities) has it's own word, unknown to both you and I.

My curiosity regards our inhouse statistics for why we ship late - one of our causes is referred to as "labor". It's the biggest one, since we're low volume / high mix, and we have to staff up and down depending, just as I'm certain everybody else does to some extent. But since it's the biggest one, I'll wager there are other factors buried in there - friction from resetting the line (moving components in and out for differing builds) etc.

Can you shed any light on this? Thanks, and apologies for piggybacking on your thread.
  Post Number #3  
Old 4th January 2017, 12:51 PM
Candi1024

 
 
Total Posts: 128
Re: Understanding Cycle Time - Why the time of the other activities are left out

Cycle time is how long it takes for a single process to be completed. Another way to explain it is how long is the time between outputting a single completed piece? If the cycle time was 30 min, (and you made 1 piece at a time) the production rate would be 2 per hour.


Lead time is how long it takes for one single product to travel through the production flow. That would be the sum of all the process times.
Thank You to Candi1024 for your informative Post and/or Attachment!
  Post Number #4  
Old 4th January 2017, 01:11 PM
Michael_M

 
 
Total Posts: 559
Re: Understanding Cycle Time - Why the time of the other activities are left out

I will use a modified example of what we do for cycle time (assume each step is run after the previous step is completed):
Lets say 100 parts


Step...Process............Time each.........total time
10......Lathe turn........45 sec..............4500 seconds or 75 minutes
20......Lathe finish......30 sec..............3000 seconds or 50 minutes
30......Mill Finish........120 seconds.....12000 seconds or 200 minutes

With this pattern, we have 19,500 seconds or 325 minutes to run all 100 parts. Now lets combine step 10 and 20 into a single operation:

Step...Process..............Time each.........total time
10......Lathe Complete..45 sec..............4500 seconds or 75 minutes
20......Mill Finish..........120 seconds.....12000 seconds or 200 minutes

Since step 10 is running what was step 10 and 20 at the same time, we use the highest time (45 seconds in this case) since the 2nd machine is running at the same time as the first. This reduces the cycle time to 16,500 seconds or 275 minutes.

Note: This is a very basic version. It does not take into account setup times or other steps required.
Thanks to Michael_M for your informative Post and/or Attachment!
  Post Number #5  
Old 4th January 2017, 01:11 PM
normzone

 
 
Total Posts: 765
Re: Understanding Cycle Time - Why the time of the other activities are left out

" Lead time is how long it takes for one single product to travel through the production flow. That would be the sum of all the process times. "

I can readily agree with the first part of that statement, that's how we use it.

But the second part doesn't appear to take into account concurrent processes.

EDIT: Ah, [Michael M] got in there while I was posting.
  Post Number #6  
Old 4th January 2017, 01:43 PM
Bev D's Avatar
Bev D

 
 
Total Posts: 3,631
Re: Understanding Cycle Time - Why the time of the other activities are left out

Candi1024 is close...Normzone is correct in the sense that many people just cant' resist changing the definition of common words.

Cycle time is an internal manufacturing time. It is the time it takes a single part to complete the process, either individual process steps or the entire process including parallel operations. It includes queue time, idle time, downtime, actual touch time, whatever. It is the time from start to finish. For a single process, the clock starts when the part competes the previous step and it stops when the part completes the step for which you are calculating the cycle time. When dealing with total cycle time you must decide on the actual start time. Is it when the parts hit the floor or when the order is released? things like that. You also need to clearly identify the 'completion time'. is it when the part hits a shippable location? or is once all manufacturing steps are complete? But you need to be honest with yourself if you want to make real improvements to cycle time or use it for accurate planning purposes.

Lead time is a Supplier - Customer term and includes all of the time from ORDER to DELIVERY

I suspect that the source that identifies 'cycle time' as the bottleneck is trying to say that the bottleneck will control cycle time (which is true) or they are trying to make up their own definition of cycle time...
  Post Number #7  
Old 4th January 2017, 01:47 PM
Bev D's Avatar
Bev D

 
 
Total Posts: 3,631
Re: Understanding Cycle Time - Why the time of the other activities are left out

Quote:
In Reply to Parent Post by normzone View Post

My curiosity regards our inhouse statistics for why we ship late - one of our causes is referred to as "labor". It's the biggest one, since we're low volume / high mix, and we have to staff up and down depending, just as I'm certain everybody else does to some extent. But since it's the biggest one, I'll wager there are other factors buried in there - friction from resetting the line (moving components in and out for differing builds) etc.

Can you shed any light on this? Thanks, and apologies for piggybacking on your thread.
Perhaps this question belongs in it's own thread?

in the meantime, let me just say that in my experience this assigning of 'causes' to late shipments (or anything else for that matter) is usually less about trying to understand the causal mechanisms of something and more about assigning blame...they are not grounded in facts and are such over aggregated 'categories' as to make them useless in driving improvements...
  Post Number #8  
Old 4th January 2017, 02:18 PM
normzone

 
 
Total Posts: 765
Re: Understanding Cycle Time - Why the time of the other activities are left out

[Bev D], you're correct that a discussion of this issue belongs in it's own thread.

I agree that such categorizations of causes are often used to play the blame game, but in this case my goal is to determine what our actual process capability is, and look for possible process improvements.

In collecting and analyzing data I'm also hoping to be the benefactor of a phenomena I've often seen - you begin collecting and analyzing data and the problem goes away as soon as you begin looking at it regularly. Can't hurt to hope
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Line Balance Study and maybe Takt Time and Cycle Time jkittle Lean in Manufacturing and Service Industries 3 10th October 2012 12:58 PM
Takt Time vs. Cycle Time vs. Total Cycle Time tomccchang Lean in Manufacturing and Service Industries 29 28th November 2011 12:28 PM
Methods for Measuring Cycle Time in Assembly and Machining Activities praveenraaaj Manufacturing and Related Processes 4 4th November 2011 01:16 PM
Takt Time & Cycle Time Calculations paxbritannia Lean in Manufacturing and Service Industries 6 30th September 2011 03:57 PM
ISO 9001:2000 DIS? One day left for delivery of DIS. Will it be on time? Karen ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18 21st January 2000 12:07 AM



The time now is 04:51 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"