Measurement System Analysis/validation to new factory

E

EricLu

Hi,

our factory is moving to new location, in regarding to metrology CNC equipment,
Besides the calibration – how to prove the metrology methods have not changed and still validation?

Thanks
Eric
 

dubrizo

Involved In Discussions
My .02

I would author a document that would encapsulate your move plan. This plan would detail how re-qualification of your CNCs and other equipment, as applicable, would be calibrated and verified--this should already be covered in your QMS if you are ISO certificated. There's no need to prove how metrology methods have changed, so long as you are not actually changing the method(s)...
 
E

EricLu

Hi dubrizo,

Thanks for suggestion.
Because we are currently under ISO13485 accreditation and our scope is only for manufacturing rather than inclusive V&V.

Our customer is looking for a Measurement system verification to show a bit confidence.
Have you had any examples in regarding with this verification plan to share?

Thanks a lot.
Eric
 
Top Bottom