The Cove Business Standards Discussion Forums
Equipment Change or Process Change? Validation protocol for a planar freezer
UL - Underwriters Laboratories - Health Sciences
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Equipment Change or Process Change? Validation protocol for a planar freezer
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

Equipment Change or Process Change? Validation protocol for a planar freezer


Monitor the Elsmar Forum
Sponsor Links




Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
equipment qualification and validation
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  Post Number #1  
Old 9th October 2008, 08:22 AM
RV123

 
 
Total Posts: 3
Please Help! Equipment Change or Process Change? Validation protocol for a planar freezer

I am reviewing a validation protocol for a planar freezer in which the rate in the procedure has to be changed in one of the temperature ramp up steps from +15C/min to +10C/min to avoid an overshoot.

Would you consider this strictly a process change or an equipment change or both?

Thanks!

Sponsored Links
  Post Number #2  
Old 9th October 2008, 08:51 AM
Jen Kirley's Avatar
Jen Kirley

 
 
Total Posts: 6,113
Re: Equipment Change or Process Change?

Welcome to The Cove! This is a good first question.

An equipment change is needed when the equipment can't perform the desired function. If a temperature change can't be ramped at the right speed, whether from hot to cold or cold to hot, the equipment would need to be altered in some way. It's up to the organization to find the right solution for that. It isn't part of the process unless the process is set to include an equipment change every time, or even occasionally, to meet the need. This could mean changing out a piece of hardware or software, for example, as part of a tool setup or performing PM. Even these are usually separate processes that are linked, so as to make the manufacturing process least complicated for the operator. That decision is up to the organization, though.

The process change involves the impact this has on the product or material during production. There are some materials and applications of treatments in some industries that demand specific controls in order to achieve the right physical properties, chemical stability or some other relevant outcome. The process addresses finding out what those requirements are, how they will be performed (methods once the equipment is ready to perform) and how to verify the requirements are being met (thermostats, timers, calibration, databases, logsheets or whatever).

I hope this helps!
Thanks to Jen Kirley for your informative Post and/or Attachment!
  Post Number #3  
Old 9th October 2008, 09:21 AM
RV123

 
 
Total Posts: 3
Re: Equipment Change or Process Change?

Thanks Jennifer!

I think we are leaning towards process change because the equipment is capable, as is, to change the ramp up rates. As no modification is necessary (just a change in setting) I think we are outside the scope of equipment change. I realize that bit of detail would have been helpful in my original post . Your reply was helpful though, because it confirmed that an equipment change really means and alteration, and not just a change in operating perameters.

Thanks again,

Ray
  Post Number #4  
Old 9th October 2008, 09:50 AM
MIREGMGR

 
 
Total Posts: 3,685
Re: Equipment Change or Process Change?

Agreeing with your "lean-direction", and in accord with Jennifer's first sentence/second paragraph, I would consider that to be a process change.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Process Validation Protocol (API) as per new FDA Guidelines dinu344 Qualification and Validation (including 21 CFR Part 11) 19 6th June 2013 01:03 PM
Process Change Notification (PCN) form to notify our customers of a change billherbst Document Control Systems, Procedures, Forms and Templates 3 29th March 2012 04:30 AM
Change Point & Process Change - Differences kclyn Misc. Quality Assurance and Business Systems Related Topics 1 8th August 2011 01:21 AM
Implementing a change for a particular Process - Document & Change Control AnandR ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3 19th April 2011 08:11 AM
ECO (Engineering Change Order) Revision - Letter change or part number change? kcmomde Manufacturing and Related Processes 13 28th July 2008 05:39 PM



The time now is 07:33 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"
The Elsmar Cove web site and all content is owned by Rabbithash Corp. as of 1 MAY 2018.
Unlike Facebook and other properties such as Linkedin, We don't buy, sell, or "share" visitor information. Never have, Never will...
GDPR Compliant since 1996, keeping Marc's vision alive!