Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

Monitor the Elsmar Forum
Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

AIAG - Automotive Industry Action Group

ASQ - American Society for Quality

International Organization for Standardization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags
api q1 - oil industry quality management system (qms), contingency plans, risk management and analysis
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  Post Number #1  
Old 13th August 2014, 10:21 AM
MalDu

 
 
Total Posts: n/a
Please Help! Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

Referring to the new requirements of the 9th. Edition of API Spec Q1 for risk assessment & management & contingency planning, I've made a standard (general) Risk Assessment and Management Sheet and a Standard Contingency Plan and specified in procedure that specific ones are generated when needed. i.e. when the requirements differ (e.g. new order that we haven't done before).

In other words, we don't have to do risk assessment and contingency planning for every single order I mean. Please correct me if I am wrong.

Thanks.

Sponsored Links
  Post Number #2  
Old 14th August 2014, 07:53 PM
Stijloor's Avatar
Stijloor

 
 
Total Posts: 15,334
Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

A Quick Bump!

Can someone help?

Thank you very much!
  Post Number #3  
Old 18th August 2014, 09:55 AM
bluepagen

 
 
Total Posts: 81
Music Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

MalDu, we made a simple Risk Register, something that was divided by processes, jotting down things that have caused issues in the past for each process and things that can go wrong in each process.
Thanks to bluepagen for your informative Post and/or Attachment!
  Post Number #4  
Old 18th August 2014, 10:02 AM
bluepagen

 
 
Total Posts: 81
Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

hope this has uploaded. And I hope this will help.
Attached Files: 1. Scan for viruses before opening, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: xls Risk%20Register%20working%20copy%20(2).xls (80.0 KB, 1033 views)
Thank You to bluepagen for your informative Post and/or Attachment!
  Post Number #5  
Old 18th August 2014, 11:30 AM
RoxaneB's Avatar
RoxaneB

 
 
Total Posts: 3,016
Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

Quote:
In Reply to Parent Post by MalDu View Post

Referring to the new requirements of the 9th. Edition of API Spec Q1 for risk assessment & management & contingency planning, I've made a standard (general) Risk Assessment and Management Sheet and a Standard Contingency Plan and specified in procedure that specific ones are generated when needed. i.e. when the requirements differ (e.g. new order that we haven't done before).

In other words, we don't have to do risk assessment and contingency planning for every single order I mean. Please correct me if I am wrong.

Thanks.
While I am not familiar with this particular standard, in my experience when 'contingency planning' is involved, this is more inline with developing and implementing processes and practices should there be a disaster or emergency which impacts your facility. These could include computer systems/backups, energy shut-downs and start-ups, natural disasters, terrorism, etc. The purpose is two-fold:
  1. To ensure the company resumes operating in a safe and effective and timely manner.
  2. To demonstrate that processes are in place ensuring all possible actions will be taken to meet customer requirements (e.g., product specifications, delivery dates, etc.)

I didn't think this particular subject addressed making a new order (i.e., one with specifications that has not be manufactured previously)...wouldn't that fall under product planning/design?

Again, I am not familiar with the details of this particular standard and if I am wrong, I'm sure I'll be corrected.
  Post Number #6  
Old 19th August 2014, 08:21 AM
Rajeev6189

 
 
Total Posts: n/a
Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

Thanks to bluepagen for attachment.
kind regards
rajeev
  Post Number #7  
Old 30th September 2014, 05:38 PM
BGirard

 
 
Total Posts: n/a
Question Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

Thanks bluepagan... that was very helpful... so once this register is made, when is it consulted? every order... were a service company trying to make it in a manufacturing spec...lol

BG
  Post Number #8  
Old 1st October 2014, 02:55 PM
bluepagen

 
 
Total Posts: 81
Re: Risk Assessment & Contingency Planning (API Q1, 9th. Ed.)

That is a very good question, and one that our Quality Manager just asked me yesterday. He wanted to kow what was the evidence of the review of the risk register.

In our company, we use the risk register right up front, in requests for quotes, reviewing an order and entering an order. Then bringing all together again to go through all the details of a job. Sales can see what has happened in the past, what can happen, and how we have mitigated it to reduce the risk. We went as far as to document a question on our contract review form and supplemental contract review form asking if the risk register has been reviewed. This requires the sales person to do a quick check, in his areas listed on the register, and sign. This form and the supplemental contract review form both have the question, and once filled out during the reviews, it is put into the sales file, or scanned in for the electronic file.

Evidence of the review of the risk register is the person's name on the checklists, which also gets dated.

One of the new questions when doing internal audits, is at what point in your job is the risk register reviewed? Followed with- and how are you indicating the review? A simple print out of that departments review of risks associated with their area of responsibilities, can be printed, signed, dated and forwarded to sales for inclusion into the file.

Our engineering department does FEMA and FEMDA's on their end, so that is associated to the design file.

It is a new process for us also. We really did not know how to approach it either. As an auditor, I have a finding history that I have kept for 10+ years. I always review back to that file when something is noted in an audit that I know is a blast from the past. A lot of times something will occur again when we beef up our staff with new people or when we are swamped! So people tend to try to hurry, skip a step, fail to question, or whatever we as people tend to do. That history, to me, meant is was possible to do it because we at some point did it, but, we had a corrective actioin for it, and that was where I started. These things did happen and could happen again. Luckily we had a way to midigate the risk, and that was by looking at the documentation that was provided when it was and opportunity for improvement or a finding.
Thanks to bluepagen for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > >

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Risk analysis 6.1 and contingency plans 6.1.2.3, are they related? SamuelB IATF 16949 - Automotive Quality Systems Standard 4 31st August 2018 04:03 AM
Behaviour Assessment for Hazard Identification & Risk Assessment kewin Occupational Health & Safety Management Standards 25 29th December 2017 05:46 AM
Risk Assessment, Business Continuity Planning, Testing, BCP, etc as part of ISO 27001 AnandR IEC 27001 - Information Security Management Systems (ISMS) 8 23rd May 2012 06:40 AM
Hazard Identification and Risk Assessment - Can Risk Assessment be "Grandfathered"? sabeard1975 Occupational Health & Safety Management Standards 4 10th March 2012 01:13 PM
ISO 27001 Gap Assessment content vs. Risk Assessment romelroche Other ISO and International Standards and European Regulations 2 27th July 2009 03:07 AM



The time now is 04:12 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.



Misc. Internal Links


NOTE: This forum uses "Cookies"