The Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Cove Discussion Forums Main Page
UL - Underwriters Laboratories - Health Sciences
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > Common Quality Assurance Processes and Tools > Six Sigma
Forum Username

Elsmar Cove Forum Visitor Notice(s)

Wooden Line

How to calculate the sigma level of a process and Relationship of DPMO


Elsmar XML RSS Feed
Elsmar Cove Forum RSS Feed

Monitor the Elsmar Forum
Sponsor Links




Courtesy Quick Links


Links Elsmar Cove visitors will find useful in the quest for knowledge and support:

Jennifer Kirley's
Conway Business Services


Howard's
International Quality Services


Marcelo Antunes'
SQR Consulting, and
Medical Devices Expert Forum


Bob Doering
Bob Doering's Blogs and,
Correct SPC - Precision Machining


Ajit Basrur
Claritas Consulting, LLC



International Standards Bodies - World Wide Standards Bodies

ASQ - American Society for Quality

International Standards Organization - ISO Standards and Information

NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest

IEST - Institute of Environmental Sciences and Technology


Some Related Topic Tags (Not all threads are Tagged)
dpmo (defects per million opportunities), sigma level, six sigma (general), statistical analysis and studies
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
  Post Number #1  
Old 21st April 2005, 11:41 AM
jackylpt's Avatar
jackylpt

 
 
Total Posts: 38
Question How to calculate the sigma level of a process and Relationship of DPMO

Hi there,

Now the six sigma is buzzword in many area. My question is how to calculate process sigma level.

For exmaple, suppose there is no shift in process, our process means is 100, taget is also 100,process sigma(by R/d2 calculating) is 1.8, specification is 90--110,

Question1: how to calculate sigma level?
is it (110-90)/6*1.8?
Question2: now I am also confusing how to calculate the cpk of this ?

thanks

michael

Sponsored Links
  Post Number #2  
Old 24th April 2005, 01:14 PM
Bob Ablondi

 
 
Total Posts: 46
Calculating sis sigma

The calculation of a Sigma level, is based on the number of defects per million opportunities (DPMO).

In order to calculate the DPMO, three distinct pieces of information are required:
a) the number of units produced
b) the number of defect opportunities per unit
c) the number of defects

The actual formula is:

DPMO = (Number of Defects X 1,000,000)

((Number of Defect Opportunities/Unit) x Number of Units)

Example:

A manufacturer of computer hard drives wants to measure their Six Sigma level.
Over a given period of time, the manufacturer creates 83,934 hard drives.
The manufacturer performs 8 individual checks to test quality of the drives.
During testing 3,432 are rejected.


Defects 3432 DPMO 5111.158768
Opportunities 83934 Sigma Level 4.1
Defect Opportunities per unit 8


Six Sigma Table: 1 690,000
2 308,000
3 66,800
4 6,210
5 320
6 3.4
Sponsored Links

  Post Number #3  
Old 25th April 2005, 12:42 AM
Marc's Avatar
Marc

 
 
Total Posts: 25,771
Thanks for the help on this one, Bob!
  Post Number #4  
Old 27th April 2005, 11:57 AM
jackylpt's Avatar
jackylpt

 
 
Total Posts: 38
Quote:
In Reply to Parent Post by Bob Ablondi

The calculation of a Sigma level, is based on the number of defects per million opportunities (DPMO).

In order to calculate the DPMO, three distinct pieces of information are required:
a) the number of units produced
b) the number of defect opportunities per unit
c) the number of defects

The actual formula is:

DPMO = (Number of Defects X 1,000,000)

((Number of Defect Opportunities/Unit) x Number of Units)

Example:

A manufacturer of computer hard drives wants to measure their Six Sigma level.
Over a given period of time, the manufacturer creates 83,934 hard drives.
The manufacturer performs 8 individual checks to test quality of the drives.
During testing 3,432 are rejected.


Defects 3432 DPMO 5111.158768
Opportunities 83934 Sigma Level 4.1
Defect Opportunities per unit 8


Six Sigma Table: 1 690,000
2 308,000
3 66,800
4 6,210
5 320
6 3.4
Dear Bob,

thank you so much for your infomation. I have anther way to calcuate it, but the result is different. Would you please give me some suggestion?

DPU: 3432/83934=0.0408
Y=FPY=e(-DPU)=e(-0.0408)=0.96
probability of a defect {P(d)}=1-Y=1-0.96=0.04
using Z value table is 1.75 sigma

so it is different.

thanks

Michael
  Post Number #5  
Old 27th April 2005, 05:04 PM
Bob Ablondi

 
 
Total Posts: 46
Quote:
In Reply to Parent Post by jackylpt

Hi there,

Now the six sigma is buzzword in many area. My question is how to calculate process sigma level.

For exmaple, suppose there is no shift in process, our process means is 100, taget is also 100,process sigma(by R/d2 calculating) is 1.8, specification is 90--110,

Question1: how to calculate sigma level?
is it (110-90)/6*1.8?
Question2: now I am also confusing how to calculate the cpk of this ?

thanks

michael
The method shown is with a plus/minus 1.5sigma shift based on Motorola's allowance for process variation in manufacturing.

Bob
  Post Number #6  
Old 27th April 2005, 05:28 PM
Tim Folkerts's Avatar
Tim Folkerts

 
 
Total Posts: 972
That pesky 1.5 sigma shift sure makes life difficult! And the question of what an "opportunity" is!

There is a "Sigma calculator" you can use at
http://www.isixsigma.com/sixsigma/si...asp?m=advanced

If you have a situation with...
* 83934 units
* 3432 defective units
* each unit is 1 opportunity

Then you have 4.1% defective = 41,000 DPMO. The calculator above says that if the process is centered then this is a 1.74 sigma process. Using the "standard" 1.5 sigma shift says this is a 3.24 sigma process. (these numbers aren't too hard to come up with - they assume a normal distribution that would produce a similar number of defects at the closer spec limit.)

If you considered each test as an opportunity, then you would have 8 times as many opportunities, and a correspondingly better sigma value.


For the example you gave, with x-bar=100, limits at 90 & 100, and sigma = 1.8, you are currently (110-100)/1.8 = 5.56 sigma from the closest spec limit. However, since the "standard" calculation assumes that the process might drift 1.5 sigma, i.e the center might drift by 1.8*1.5 = 2.7. You would then be only (110 - 102.7)/1.8 = 4.06 sigma from the closer spec limit. This would, I believe, be the "official" sigma level for the process.


Tim F
  Post Number #7  
Old 6th July 2005, 10:30 PM
Arvind

 
 
Total Posts: 58
Calculation of sigma from DPMO for defects < 55 %

http://elsmar.com/Forums/showthread....131#post114131
  Post Number #8  
Old 1st August 2008, 05:27 PM
CarlosDelgado - 2008

 
 
Total Posts: 2
Re: How to calculate the sigma level of a process and Relationship of DPMO

Quote:
In Reply to Parent Post by Tim Folkerts View Post

That pesky 1.5 sigma shift sure makes life difficult! And the question of what an "opportunity" is!

There is a "Sigma calculator" you can use at
http://www.isixsigma.com/sixsigma/si...asp?m=advanced

If you have a situation with...
* 83934 units
* 3432 defective units
* each unit is 1 opportunity

Then you have 4.1% defective = 41,000 DPMO. The calculator above says that if the process is centered then this is a 1.74 sigma process. Using the "standard" 1.5 sigma shift says this is a 3.24 sigma process. (these numbers aren't too hard to come up with - they assume a normal distribution that would produce a similar number of defects at the closer spec limit.)

If you considered each test as an opportunity, then you would have 8 times as many opportunities, and a correspondingly better sigma value.


For the example you gave, with x-bar=100, limits at 90 & 100, and sigma = 1.8, you are currently (110-100)/1.8 = 5.56 sigma from the closest spec limit. However, since the "standard" calculation assumes that the process might drift 1.5 sigma, i.e the center might drift by 1.8*1.5 = 2.7. You would then be only (110 - 102.7)/1.8 = 4.06 sigma from the closer spec limit. This would, I believe, be the "official" sigma level for the process.


Tim F
I cant accept your apreciation as simple as you say

If is a continuous process, How do you calculate DPMO ..... its depen of the kind of the testing, testing frecuency ........... for me yield must be equal to sigma levels in cetered, normal distribution variable ................... if that we can use the same formula said (Upper Level less media)/sigma.......... we must say exactly what we got real in our process and it work for us ........ theory is not required please...... I dont know if you get my email but is [email protected] and [email protected]........... whenever you want to dicussed it please send it ....... if you know about 6sigma and know your process we can learn join

Best regards
Carlos Delgado
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Business Systems and Standards Discussion Forums > Common Quality Assurance Processes and Tools > Six Sigma

Bookmarks



Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Emoticons are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Confusion DPU, PPM & DPMO vs. Sigma Level - ASQ Six Sigma Black Belt hand book Stephane Dubreuil Six Sigma 14 16th October 2014 01:09 PM
Calculating Combined DPMO and Sigma Level for Two or More Different Work Areas Blake Slayton Six Sigma 3 20th June 2013 01:50 PM
Formula to calculate the Process Sigma from an RPN Black Belt Auditor Six Sigma 17 8th June 2010 05:46 PM
How to correctly calculate sigma level for production processes Przemek Six Sigma 2 24th April 2009 06:23 PM
How to calculate the sigma level of a process - Which one is right jackylpt Six Sigma 3 24th July 2005 05:26 PM



The time now is 10:38 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


 
 


NOTE: This forum uses "Cookies"