Re: How to develop a Control Plan from a PFMEA (Process FMEA)
Hi all,
I have question about column (Control method) in control plan.
If we have 100% inspection on workstation by operator after operation assembly and no records is correct description in control plan?
for example :
100% inspection on workstation by operator after operation assembly - no records
description "no records" is correct practic or not acceptance ?
However is good pratic put comends in CP " no records"?
Thanks