Incoming Inspection Acceptance Sampling by Variables and Minitab

C

Curtis317

Thoughts/suggestions wanted. Our plant now does receiving inspection on 5 parts no matter what the lot size is. Given this is only a very weak method of verification of incoming quality it is the only method that is/was workable. Now however we are looking at establishing statisitcal method of using variables incoming evaluations. Minitab has acceptance sampling by variables. Has anyone ever used it? Does it do what you intend?

Given that we would be going from inspection 5 samples per lot to 50 or 100 per lot anyone have any thoughts on how to minimize the work load?
 
Top Bottom