C
crazyray
hello, im an newly graduated industrial engineer in a tshirt making company, we have 7 sewing lines with around 17 different operations in each line depending on the style, I made a time study with a chronometer and most of my operations range from 19 sec. to 50 sec. depending on the operation,machine and operator, i was wondering if anybody can help me find a software or excell spreadsheet thats easy to use and can help me to determine how i can rearrange my lines so that i can lower my times and increase my production.
I would apreciate your help thank you very much.
I would apreciate your help thank you very much.